Answer:
See Explanation
Step-by-step explanation:
Given
--- Number of tryouts
Required
Determine the average distance
<em>This question has missing details, as the distance he hits the ball in each tryout is not given. However, I'll give a general explanation.</em>
<em></em>
The mean is calculated as:

means the sum of the distance in each tryout.
Assume that the distance in the 10 tryouts are: 
So, the mean is:



<em>So, the average distance is 6.5</em>
You didnt provide the selections, but some answers would most likely be rotations, translations, and reflections.
<h2>COMPARE</h2>
<h2>

</h2>
The correct sign for the two given digits compared is greater than. 2.75 is greater than 2.6.
Answer:
Step-by-step explanation:
y = 2x^2 - 12x +19 Put brackets around the 1st 2 terms. Take 2
y = 2(x^2 - 6x ) + 19 Take 1/2 of the 6 square it and add inside the brackets
y = 2(x^2 - 6 + (6/2)^2) +19 Subtract 2 *9 from the 19. Express 1st 3 terms as ( )^2
y = 2(x- 3)^2 + 19 - 18
y = 2(x - 3)^2 + 1
Answers
y intercept when x = 0 is y = 19
axis of symmetry x = 3
vertex: (3,1)
Graph
graph: red
axis of symmetry: blue
y intercept, vertex: green
Answer:
a) 40.13% probability that a laptop computer can be assembled at this plant in a period of time of less than 19.5 hours.
b) 34.13% probability that a laptop computer can be assembled at this plant in a period of time between 20 hours and 22 hours.
Step-by-step explanation:
When the distribution is normal, we use the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question:

a)Less than 19.5 hours?
This is the pvalue of Z when X = 19.5. So



has a pvalue of 0.4013.
40.13% probability that a laptop computer can be assembled at this plant in a period of time of less than 19.5 hours.
b)Between 20 hours and 22 hours?
This is the pvalue of Z when X = 22 subtracted by the pvalue of Z when X = 20. So
X = 22



has a pvalue of 0.8413
X = 20



has a pvalue of 0.5
0.8413 - 0.5 = 0.3413
34.13% probability that a laptop computer can be assembled at this plant in a period of time between 20 hours and 22 hours.