Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.
They all have ads. Some have inappropriate ads while some have irrelevant ads with respect to the website your on.
Answer:
console.log(Animal);
Explanation:
The statement written above prints the array Animal which contains objects.There are two to three ways to print the array Animal in javascript. One of the method is written in the answer it prints the arrays in the console of the browser.
You can go to the console by pressing F12 and then clicking on the console.
Other methods to print are
- Simple write Animal after defining the array.
- Use alert.
- document.write()