Answer:
d. 15
Step-by-step explanation:
Putting the values in the shift 2 function
X1 + X2 ≥ 15
where x1= 13, and x2=2
13+12≥ 15
15≥ 15
At least 15 workers must be assigned to the shift 2.
The LP model questions require that the constraints are satisfied.
The constraint for the shift 2 is that the number of workers must be equal or greater than 15
This can be solved using other constraint functions e.g
Putting X4= 0 in
X1 + X4 ≥ 12
gives
X1 ≥ 12
Now Putting the value X1 ≥ 12 in shift 2 constraint
X1 + X2 ≥ 15
12+ 2≥ 15
14 ≥ 15
this does not satisfy the condition so this is wrong.
Now from
X2 + X3 ≥ 16
Putting X3= 14
X2 + 14 ≥ 16
gives
X2 ≥ 2
Putting these in the shift 2
X1 + X2 ≥ 15
13+2 ≥ 15
15 ≥ 15
Which gives the same result as above.
Answer:
y= -x/6-9
x= -6y-54
Step-by-step explanation:
Answer:
0.09375 tons
Step-by-step explanation:
In this problem, it is given that Samuel has 3/4 tons of mulch i.e. 0.75 tons of mulch.
Again it is given that Samuel has to spread equally this amount of mulch in 8 square yards of the plot.
Since the mulch is spread uniformly, then we can say that in each square yard of the plot (0.75/8) = 0.09375 tons of mulch is been spread.
Therefore, 0.09375 tons of mulch will be spread in each square yard. (Answer)
Answer:
The last graph
Step-by-step explanation:
This is because when there is a greater than sign, the line on the graph is dotted and the shaded area is facing upwards. I try to remember that when there is a greater than sign or a greater than or equal to sign, the shaded area faces up towards the sky.
Hope this helps. Please inform me if my answer is wrong.
Hey! I don’t know if this is what you mean.. but I tried to understand it.
78^1
73^1
Have a good day :)