5

The population of a certain city was 25,000 in 2010 and decreased by 4% each year afterwards. The population can be modeled by e

xponential function of the form y=ab^x, where x represent the number of year since 2010. What are the values of a a and b
Mathematics
1 answer:
eimsori [14]3 years ago
8 0

Answer:

Step-by-step explanation:

In y=a(b)^x a is the initial value and b is the growth/decay rate.  Our initial population was 25,000 so a = 25,000.  Our rate of decay is 4% or, as a decimal, .04. BUT if the rate of decay is .04, then .96 remains.  b = .96

You might be interested in
LINEAR, QUADRATIC, EXPONENTIAL REVIEW: QUESTION 3 Find the equation of the line that has a slope of 2 and passes through the poi
Whitepunk [10]

The point-slope form:

y-y_1=m(x-x_1)

We have

m=2,\ (1,\ 7)

Substitute:

y-7=2(x-1)\qquad|\text{use distributive property}\\\\y-7=2x-2\qquad|+7\\\\y=2x+5\qquad|-5\\\\y-5=2x\qquad|-y\\\\2x-y=-5

<h3>Answer:</h3><h3>point-slope form: y - 7 = 2(x - 1)</h3><h3>slope-intercept form: y = 2x + 5</h3><h3>standard form: 2x - y = -5</h3>
4 0
3 years ago
Identify each line or segment that intersects ⊙ T. HELP PLEASE!!!
Zarrin [17]

Answer:

The 2 option :)

Step-by-step explanation:

7 0
3 years ago
The average production cost for major movies is 57 million dollars and the standard deviation is 22 million dollars. Assume the
Degger [83]

Using the normal distribution, we have that:

  • The distribution of X is X \approx (57,22).
  • The distribution of \mathbf{\bar{X}} is \bar{X} \approx (57, 5.3358).
  • 0.0597 = 5.97% probability that a single movie production cost is between 55 and 58 million dollars.
  • 0.2233 = 22.33% probability that the average production cost of 17 movies is between 55 and 58 million dollars. Since the sample size is less than 30, assumption of normality is necessary.

<h3>Normal Probability Distribution</h3>

The z-score of a measure X of a normally distributed variable with mean \mu and standard deviation \sigma is given by:

Z = \frac{X - \mu}{\sigma}

  • The z-score measures how many standard deviations the measure is above or below the mean.
  • Looking at the z-score table, the p-value associated with this z-score is found, which is the percentile of X.
  • By the Central Limit Theorem, the sampling distribution of sample means of size n has standard deviation s = \frac{\sigma}{\sqrt{n}}.

In this problem, the parameters are given as follows:

\mu = 57, \sigma = 22, n = 17, s = \frac{22}{\sqrt{17}} = 5.3358

Hence:

  • The distribution of X is X \approx (57,22).
  • The distribution of \mathbf{\bar{X}} is \bar{X} \approx (57, 5.3358).

The probabilities are the <u>p-value of Z when X = 58 subtracted by the p-value of Z when X = 55</u>, hence, for a single movie:

X = 58:

Z = \frac{X - \mu}{\sigma}

Z = \frac{58 - 57}{22}

Z = 0.05.

Z = 0.05 has a p-value of 0.5199.

X = 55:

Z = \frac{X - \mu}{\sigma}

Z = \frac{55 - 57}{22}

Z = -0.1.

Z = -0.1 has a p-value of 0.4602.

0.5199 - 0.4602 = 0.0597 = 5.97% probability that a single movie production cost is between 55 and 58 million dollars.

For the sample of 17 movies, we have that:

X = 58:

Z = \frac{X - \mu}{s}

Z = \frac{58 - 57}{5.3358}

Z = 0.19.

Z = 0.19 has a p-value of 0.5753.

X = 55:

Z = \frac{X - \mu}{s}

Z = \frac{55 - 57}{5.3358}

Z = -0.38.

Z = -0.38 has a p-value of 0.3520.

0.5753 - 0.3520 = 0.2233 = 22.33% probability that the average production cost of 17 movies is between 55 and 58 million dollars. Since the sample size is less than 30, assumption of normality is necessary.

More can be learned about the normal distribution at brainly.com/question/4079902

#SPJ1

8 0
2 years ago
James is studying different kinds of weather.
expeople1 [14]
What ?

Step by step step by step equations
7 0
3 years ago
Z
timofeeve [1]

Answer:

Z

ㄲ

Respuesta: se necesitan 15 casos para las 4 lámincis.

El primer 3 indica los 3 clavos para el lado izquierdo de la primera lámina. los números del L...4

indican el número de laminas, y el segundo 3 indica el número de claves para el lado derecho de

cada lamina.

lámina y se calcula

A mumero de casos se obtiene relacionando el número de liminas con la cantidad de clavos per

3 + nuncro deliminas) X 3

Cuilice si patria numérico anterior para encontrar la cantidad de clavos necesarios según el número

b. 6 laminas

10 Sáminas

0.

-se de forma física bien identificados.

5: Leer el contenido de la presente guía, realizar las

FECHA: 06 al 17 septiembre 2021

Tercel CUMP

E de liminas

a

Liminas

C.

8 0
3 years ago
Other questions:
  • Four employees of papa Tony's Pizza are cleaning up at the end of a busy night. There is a list of 43 clean up tasks that need t
    10·2 answers
  • If a 100-pound block of ice is placed on an inclined plane that makes an angle of 35° with the horizontal, how much friction for
    5·1 answer
  • It's B right? please help will mark brainliest
    5·1 answer
  • 1/2x + 1/4 = 6 <br><br> PLEASE help
    8·1 answer
  • A taxi company charges $3 per ride plus $1.50 for each mile traveled. Andrea wants to spend no more than $24 on a taxi ride. How
    12·1 answer
  • What is the least common multiple of 12 32
    9·2 answers
  • Question 4................................(2)
    10·1 answer
  • Factor -1/2 out of -1/2x+6<br>the factored expression is​
    12·1 answer
  • 2+2 what is the answer​
    5·2 answers
  • Find the output, hhh, when the input, ttt, is 353535.
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!