1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
vovikov84 [41]
3 years ago
6

What was it called when states were allowed to choose if they want it to be a slave state or a free state

Social Studies
1 answer:
juin [17]3 years ago
8 0

Answer:

i believe Missouri Compromise

Explanation:

You might be interested in
Define police brutality
Pachacha [2.7K]
Police brutality<span> is the use of excessive and/or unnecessary force by </span>police<span> when dealing with civilians. “Excessive use of force” means a force well beyond what would be necessary in order to handle a situation.</span>
4 0
3 years ago
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
People consider personality traits most when they _____ friends.
erica [24]
I am pretty sure that the answer that goes in the blank is <em><u>need</u></em>
8 0
3 years ago
Read 2 more answers
Which is an example of a national symbol for the United States?
Murrr4er [49]

Answer:

D) all of the above

Explanation:

hope this helps and i'm very sorry if i'm wrong <3

Brainliest?

3 0
3 years ago
Which of the following became the largest and most powerful white supremacy group?
Romashka-Z-Leto [24]

The Ku Klux Klan became the largest and most powerful white supremacy group.

<u>Explanation:</u>

White supremacy is the racialist idea that white people are superior to people of other cultures and therefore should be ruling over them. White supremacy has origins in the now-discredited theory of scientific segregation and often relies on pseudoscientific reasons.

The Ku Klux Klan started as a vigilante organization of previously associated soldiers trying to frighten once slaves and other blacks after the Civil War. The society recognizes itself today as a Christian “civil rights for whites” organization. Loyal White Knights are one of the greatest and most powerful Klan groups in the United States.

8 0
3 years ago
Read 2 more answers
Other questions:
  • The things in your life that you consider to be important to you are called?
    12·1 answer
  • Pirate radio stations began to spring up as a result of:
    8·1 answer
  • Which of the following scenarios would most likely result in the increase of a country’s mortality rate? A. France has its most
    16·2 answers
  • Why is it important for the Civil Service to be politically neutral? (WASSCE 1996, No 5b).
    8·1 answer
  • Which of the following mountain ranges is best known for its rich natural resources, including minerals and lumber?
    13·2 answers
  • Ooooooo
    11·2 answers
  • Which is the student centered method of teaching? A)lecture method B) Demonstration method C)Question answer method D)Study assi
    11·1 answer
  • What is one example of an effect in the section "The Pull of Gravity "? What is the cause of this effect
    15·1 answer
  • Mcclelland’s need for achievement corresponds most closely to
    13·1 answer
  • The baby-care brand the honest company was founded by what actress?
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!