<span>A particular computer takes 12 minutes to download a 36-minute TV show. How long will it take the computer to download a 2-hour movie
that would take 40 minutes</span>
Answer:
3600
Step-by-step explanation:
0.1*4000=400
4000-400=3600 gallons
Answer:
D
Step-by-step explanation:
A is incorrect because if 1 x value corresponds to multiple y values, it is not a function
B is incorrect for the same reason as a
C is incorrect because it is linear
D is correct because 1.) all of the others are wrong, and 2.) it is nonlinear.
Y = mx + b. This linear graph passes through A(0,50) and B(10,51)
m = (y₂-y₁)/(x₂-x₁)
m= (51-50)/10-0)
m=(1)(10)
y = (1/x) + b. To find b, you plugin the coordinates of either A or B,
say A(0,50):
50 = (1/10).(0) + b
50 = 0+b and b= 51
Hence the equation is y =0.1x + 50
M=-2/3
This is because it’s the slope I got and I don’t know how to explane it