Answer:
we conclude that:
Step-by-step explanation:
Given
f(x) = x+9
g(x) = x² + 7x – 14
To determine
g(f(-5)) = ?
First, we need to find f(-5)
f(x) = x+9
substitute x = -5
f(-5) = (-5)+9
f(-5) = -5+9
f(-5) = 4
so
g(f(-5)) = g(4)
Now, we need to find g(4)
g(x) = x² + 7x – 14
substitute x = 4
g(4) = (4)² + 7(4) - 14
g(4) = 16 + 28 - 14
g(4) = 30
i.e.
g(f(-5)) = g(4) = 30
Therefore, we conclude that:
Answer:
ok so it would take more effort to lift the 1 newton that is 4 m
Step-by-step explanation:
Work is done when a an object with a certain weight is moved at a given distance;
It is the product of force and distance and therefore varies directly to both distance and force.
Work = Force × distance;
For a 4 N box 0.5 m;
Work = 4 × 0.5
= 2 Joules
For a 1 N box 4 m
Work = 1 × 4
= 4 Joules
Therefore, Lifting a 1 N box for 4 m, will take more work
hope this helps
~ukiahsmith1
P.S pls mark brianliest
have a nice day :D
The answer is seven tenths
Answer: 145
Step-by-step explanation:
you have to find what x is based on the other side
4x+15+30x-5=180
x=5
plug in 5 in 20x+45
which equals 145