Answer:
First question: LCL = 522, UCL = 1000.5
Second question: A sample size no smaller than 418 is needed.
Step-by-step explanation:
First question:
Lower bound:
0.36 of 1450. So
0.36*1450 = 522
Upper bound:
0.69 of 1450. So
0.69*1450 = 1000.5
LCL = 522, UCL = 1000.5
Second question:
In a sample with a number n of people surveyed with a probability of a success of , and a confidence level of , we have the following confidence interval of proportions.
In which
z is the zscore that has a pvalue of .
The margin of error is:
The project manager believes that p will turn out to be approximately 0.11.
This means that
95% confidence level
So , z is the value of Z that has a pvalue of , so .
The project manager wants to estimate the proportion to within 0.03
This means that the sample size needed is given by n, and n is found when M = 0.03. So
Rounding up
A sample size no smaller than 418 is needed.
Answer:
[-16 20 -24].
Step-by-step explanation:
4[-4 5 -6]
= [4*-4 4*5 5*-6]
= [-16 20 -24].
Distribute the 3 to the parentheses. Q=3r+3/r
Next multiply both sides by r to get rid of the division sign.
Qr=3r+3
Subtract 3r on both sides and you get Qr-3r=3
Since both numbers have an r in it, we can factor out the r
r(Q-3)=3
Then we divide Q-3 on both sides
r=3 / (Q-3)
Answer: See explanation
Step-by-step explanation:
Amount earned by movie = $3,000,000.
Percentage that went to movie = 60%
Percentage that went to theater = 40%
Revenue gotten by movie studio = 60% × $3,000,000
= 0.6 × $3,000,000
= $1,800,000
Revenue gotten by theaters = 40% × $3,000,000
= 0.4 × $3,000,000
= $1,200,000
Answer:
The answer is the third option from the top:
0, 0, 11, 15, 26, 32, 45, 46, 46, 46, 60, 71, 84, 88