Answer: All of thé above
Step-by-step explanation:
25.2:360 ::x:5100
Or 25.2 x ------=----- then cross multiply, 360x=5100*25.2
4 hours for 18
7 hours for 25.50
Difference in hours: 7-4 = 3
Difference in cost: 25.50 - 18 = 7.50
7.50 / 3 = 2.50
A. They charge 2.50 per hour.
B. 2.50 x 4 = 10
18 - 10 = 8
The flat fee is 8 dollars
C. 8 + (2 x 2.50) = 13 dollars
Answer is C because they are next to each other in 180 degree angles or 90 degrees angles
<span>The <u>correct answer</u> is:
A) 60% ± 18%.
Explanation:
In a confidence interval, the margin of error is given by z*(</span>σ/√n<span>), where </span>σ<span> is the standard deviation and n is the sample size.
First we <u>find the value of z</u>:
We want a 95% confidence level; 95% = 95/100 = 0.95.
To find the z-score, we first subtract this from 1:
1-0.95 = 0.05.
Divide by 2:
0.05/2 = 0.025.
Subtract from 1 again:
1-0.025 = 0.975.
Using a z-table, we find this value in the middle of the table. The z-score that is associated with this value is 1.96.
Back to our formula for margin of error, we have 1.96(</span>σ<span>/</span>√n<span>). The larger n, the sample size, is, the larger its square root is. When we divide by a larger number, our answer is smaller; this gives us a smaller margin of error.
This means that if we had a small sample size, we would divide by a smaller number, making our margin of error larger. The largest margin of error we have in this question is 18%, so this is our correct answer.</span>