1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
BlackZzzverrR [31]
3 years ago
5

How much time required to complete a10days work if it could complete by 3 worker in 4days and 6worker in 3.05 days,if 5 workers

is involved in it? please reply​
Mathematics
1 answer:
Andrei [34K]3 years ago
4 0

Answer:

This seems to be a linear relationship:

A linear relationship can be written as:

y = a*x + b

where a is the slope and b is the y-axis intercept.

For a line that passes through the points (x1, y1) and (x2, y2), the slope can be written as:

a = (y2 - y1)/(x2 - x1).

We know that 3 workers can complete the job in  4 days.

Then if we define W as the rate at which a single worker can complete the work, we have the ordered pair (3 workes, 4 days)

And we also know that 6 workers can finish the job in 3.05 days, then we also have the ordered pair (6 workers, 3.05 days)

Then using these two, we can find the slope of the line:

a = (3.05 days - 4 days)/(6 workers - 3 workers) = -0.35 days/worker.

Then we have the equation:

y = (-0.35 days/worker)*x + b

Where:

y represents the time to complete the job

x represents the number of workers.

b is the y-intercept, to find the value, we could just replace one of the points in the equation, for example with the point (3 workes, 4 days) we need to replace x by 3 workers, and y by 4 days:

4 days = (-0.35 days/worker)*3 workers + b

4 days = -1.4 days + b

4 days + 1.4 days = 5.4 days  = b

then the equation is:

y = (-0.35 days/workers)*x + 5.4 days.

Now we can find the number of days needed for 5 workers to finish the job, we just need to replace x by 5 workers:

y = (-0.35 days/workers)*5 workers + 5.4 days

y = 3.65 days.

You might be interested in
Figure TUVW ≅ figure ABCD, AB = 12, CD = 6, and DA = 4.
Olegator [25]
The measure of VW is 6. It's because since the figures are congruent their names are written in correspondence ....so since VW corresponds to CD , the answer must be 6.
6 0
3 years ago
Read 2 more answers
To build a box, you find a square piece of cardboard that measures 10 inches on each side. From each corner of the cardboard, yo
Mumz [18]
The correct answer is 64 square units.

The area of the complete shape would be 100 square inches.
10 x 10 = 100

However, we have to remove the 4 corners. Each of the corners is 9 square inches. 3 x 3 = 9

100 - 4(9) = 64
6 0
3 years ago
Read 2 more answers
Click the location of the point in the coordinate plane with the coordinates (–4, 3).
DerKrebs [107]

Answer:

I've put the red dot where location is.

Step-by-step explanation:

8 0
3 years ago
Can someone plz help me
JulsSmile [24]

Answer:

31.42

Step-by-step explanation:

7 0
3 years ago
Please help :) also please don’t take advantage of the points.
Gnoma [55]

Answer:

C. 50

Step-by-step explanation:

180 - (70 + 60)

180 - 130

50, so C

<em>Hope that helps!</em>

<em>-Sabrina</em>

6 0
3 years ago
Other questions:
  • I need help with question 2. Anything is appreciated:)
    14·2 answers
  • Help idk how to do this
    6·1 answer
  • What is e=mc^2 for m?
    6·1 answer
  • I need help about the maximum y - value
    14·1 answer
  • What is the range of y = sin θ ?
    10·1 answer
  • Tell whether each pair of angle measurements are complementary, supplementary or neither.  36°,24°  18°,72°  96°,84°
    9·1 answer
  • 9 Alicia has a bag that contains 12 apples.
    12·1 answer
  • Solve for t.<br><br> - 5 t ≥ 70
    6·1 answer
  • Consider the equation 2b = a. Solve the equation for b.
    8·2 answers
  • Which graph represents the solution set of this inequality? -2x + 7 &lt; 23
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!