Answer:
Yes. The data provide enough evidence to support the claim that the mean weight of one-year-old boys is greater than 25 pounds.
P-value=P(t>2.84)=0.0024
Step-by-step explanation:
Hypothesis test on the population mean.
The claim is that the mean weight of one-year-old boys is greater than 25 pounds.
Then, the null and alternative hypothesis are:

The significance level is α=0.05.
The sample size is n=354. The sample mean is 25.8 pounds and the sample standard deviation is 5.3 pounds. As the population standard deviation is estimated from the sample standard deviation, we will use a t-statistic.
The degrees of freedom are:

The t-statistic is:

For a right tailed test and 353 degrees of freedom, the P-value is:

As the P-value is smaller than the significance level, the effect is significant and the null hypothesis is rejected.
There is enough evidence to support the claim that the mean weight of one-year-old boys is greater than 25 pounds.
14 2/8 should probably be your answear
Answer:
Step-by-step explanation:
x = 1
(x^2-4x+3=0 or sin(x)=1)
x = 1
( x^2-4x+3=0 or sin(x)=1)
Answer:
bird, sea lion, fish
Step-by-step explanation:
-0.5 sea lion, -1.2 fish, 4.25 bird
15 electricians worked for 24 days to the whole job, now, there are 15 of them, so on any given day, each electrician worked one whole day, in 24 days, that one electrician worked 24 days total.
now, there were 15 electricians on any given day though, since each one of them worked the whole day that one day, so the "days work worth" on a day is 15, so the house gets 15days worth of work because of that.
so how many "days worth" did all 15 do on the 24 days, well, 15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15, namely 15 * 24, or 360 days worth of work.
since it takes 360 days worth of work to do the whole wiring, in how many days would 18 electricians do it? 360/18.