<span>A is rational</span>
<span>B is irrational</span>
<span>Product of a and b is irrational.</span>
Answer:
Longer than 27.7 minutes.
Step-by-step explanation:
When the distribution is normal, we use the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question, we have that:

The slowest quarter of customers will require longer than how many minutes (to the nearest tenth) for a simple haircut?
Longer than the 100 - 25 = 75th percentile of times, which is X when Z has a pvalue of 0.75. So X when Z = 0.675. So




So
Longer than 27.7 minutes.
3/4
Step-by-step explanation:
If you cut a whole pie into two you get two (2) ½ pieces
1 ÷ 2 = ½
When you cut the two ½ pieces into two you get four (4) ¼ pieces;
½ ÷ 2 = ¼
When you cut the four ¼ pieces into two you get 8 1/8 pieces;
¼ ÷ 2 = ¹/8
Therefore the whole pie at this point is made up of 8 ¹/8 pieces. When two (2) of these pieces are eaten we are left with 6 ¹/8 pieces;
8 – 2 = 6
The portion of the pie left therefore is;
6 * ¹/8 pieces
= ⁶/8
= ³/4
Answer: 601
Step-by-step explanation:
The formula to find the minimum sample size(n) , if the prior population proportion is unknown:
, where E = margin of error ,
= critical z-value for confidence level c.
Given : E = 0.04
Z-value for 95% confidence = 1.96
So, the minimum sample size required = 

Hence, the minimum sample size required = 601
Answer:
The final balance is $23,232.33.
The total compound interest is $3,232.33.