Answer:
c. x21 + x22 + x23 less or equal than 2800 y2
Step-by-step explanation:
The plant has a maximum capacity of 2800 then the sum of all these operations must be equal to or less than 2800. The site of the plant has capacity constraint which needs to be determine through equation. The total capacity for the plant 2 is only 2800 the operation has to be distributed with keeping in mind the capacity limit.
Answer:
support: 25%*100 > 10%*50
refute: 25%*50 < 10%*200
Step-by-step explanation:
0.25*100=25 > 0.10*50=5
0.25*50=12.5 < 0.10*200=20





8y = 8
y = 1
x = 8-2y
x = 8-2*1
x = 8-2
x = 6
<span>A.
The system has a single solution. The solution set is (6, 1)</span>
Answer:
91 km per hour
Step-by-step explanation:
45 miles per hour is the same as 72 kilometers per hour (metric), so pick any value greater than 72 km per hour.
The last option is correct
You must combine like terms v + v = 2v
Therefore, the answer is 2v+4=8