over-processing type of organizational waste refers to the work that is unnecessary or undesired and is a waste of time and resources
Explanation:
- Over -Processing is one of the seven waste of a lean manufacturing system.
- It is caused due to uncleared standards and specification of a process.
- For example:Extra Plastic Packaging on a fresh fruit of vegetable
Answer:
False
Explanation:
Compound interest refers to the interest charged on both the amount borrowed and previous interest
The greater the number of compounding periods within a year, then (1) the future value of a lump sum investment at Time 0 not necessarily is greater and (2) the present value of a given lump sum to be received at some future date not necessarily is smaller.
Therefore, the given statement is false.
<h3>
♫ - - - - - - - - - - - - - - - ~Hello There!~ - - - - - - - - - - - - - - - ♫</h3>
➷ This is the 'evolutionary' perspective.
<h3><u>✽</u></h3>
➶ Hope This Helps You!
➶ Good Luck (:
➶ Have A Great Day ^-^
↬ ʜᴀɴɴᴀʜ ♡
Answer & Explanation: The Berlin Blockade occurred between June 1948 to May 1949 which was characterized by the restriction of supplies to the U.S, Britain and French sectors of Berlin which coincidentally was situated within East Germany occupied by the Soviet Union. Railways, roads, canals etc. were blocked leaving millions of civilians without basic amenities.
In response to the Berlin Blockade of the period, the Western Allies arranged what was termed the Berlin Airlift which lasted nearly a year with the aim of bringing essential, vital supplies to the massive population of West Berlin, a difficult feat given the size of the city's population.
The blockage and the airlift response thus represented the very first major conflict of the Cold War era.
Answer:
i think it was Athenes and Sparta
Explanation: