Answer: T=4
Step-by-step explanation:
Answer:

Step-by-step explanation:
We are given with two equations
first equation is 
second equation is

we find the result of subtracting two equation
subtract the second equation from the first, so
first equation - second equation, multiply second equation by -1 and then add it with first equation


Now add both equations, we get

To answer question 12, you first need to know the definition of a <em>prism</em> and a<em> pyramid.
</em>A <em>pyramid </em> is a 3-D structure with one base, whose outer faces are made of triangles, and meet at a single point at the top.
A <em>prism</em> is any 3-D shape with a base of any number of sides, another base with the same amount of sides, and faces joining the two together on every side of the bases.
12.
Shape A is a <em>pyramid</em>, because it has one base, and all the faces join together in at one point.
Shape B is a <em>prism</em>, because it has two bases, and faces joining every side of the bases.
Shape C is a <em>prism.</em>
Shape D is a <em>pyramid.
</em>For #13, you have to know the definition of a cube to figure out the math of how many cubes there are.
A cube is a 3-D shape with six sides, all made up of squares of the same size.
The box has a volume of 120 cubic inches, and each cube is 1 inch. Since every side of a cube is equal, a 1-inch cube is one cubic inch.
This means that a box with a volume of 120 cubic inches will fit 120 of the 1 inch cubes.
1 layer of the cubes, in the diagram, is 8 cubes by 3 cubes, or 24 cubes total.
To find the number of layers needed to fill the box, you divide 120 by 24.
120 ÷ 24 = 5
The answer to #13 is 5 layers.
Answer:
d. 0.0948 ± 4.032(0.0279)
Step-by-step explanation:
A 99% confidence interval for the coefficient of promotional expenditures is, First, compute the t critical value then find confidence interval.
The t critical value for the 99% confidence interval is,
The sample size is small and two-tailed test. Look in the column headed es = 0.01 and the row headed in the t distribution table by using degree of freedom is here
for (n-2=5) degree of freedom and 99% confidence ; critical t =4.032
therefore 99% confidence interval for the slope =estimated slope -/+ t*Std error
= 0.094781123 -/+ 4.032* 0.027926367 = -0.017822 to 0.207384