My answer would be to add 3 to both sides
Answer:
there is a .0625% chance of getting yellow
Step-by-step explanation:
<u>Answer:</u>
Cost of sand = £150
Cost of bricks = £157.5
Cost of cement = £134
Total cost = £441.50
<u>Step-by-step explanation:</u>
We are given that:
2 tonnes of sand is for £75.00 per tonne,
20 bags of cement are for £6.70 per bag,
350 bricks at 45p each,
So, 2 tonnes of sand at £75.00 per tonne = 2 * £75.00 = £150.00
20 bags of cement at £6.70 per bag = 20 * £6.70 = £134.00
350 bricks at 45p each = 350 * £0.45 = £157.50
Therefore, the total cost of all the materials = £150 + £134 + £157.5 = £441.50
Let's call the width: w
the lenght is then 3w+4 ("4 more than 3 times the width")
and the parameter would be 2(w+3w+4), that is 2*(4w+4), that is 8w+8.
this is also equal to 18.4:
8w+8=18.4
8w=10.4
w=1.3
this is the width, and the lenght is:
4+3*1,3=4+3.9=7.9
and the area is their product:
1.3*7.9=10.27
Answer:
13.4
Step-by-step explanation: