1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
aleksandr82 [10.1K]
3 years ago
7

a stone is thrown vertically upward with a velocity of 29.4m/s from the top of tower 34.3m high.calculate the total time taken b

y the stone to reach the foot of the tower.​
Physics
1 answer:
Alexus [3.1K]3 years ago
6 0

Answer:

7 s

Explanation:

We'll begin by calculating the maximum height reached by the stone from the point of projection. This can be obtained as follow:

Initial velocity (u) = 29.4 m/s

Acceleration due to gravity (g) = 9.8 m/s²

Final velocity (v) = 0 m/s (at maximum height)

Maximum height (h) =?

v² = u² – 2gh (since the stone is going against gravity)

0² = 29.4² – (2 × 9.8 × h)

0 = 864.36 – 19.6h

Collect like terms

0 – 864.36 = –19.6h

–864.36 = –19.6h

Divide both side by –19.6

h = –864.36 / –19.6

h = 44.1 m

Next, we shall determine the time taken to reach the maximum height from the point of projection. This can be obtained as follow:

Initial velocity (u) = 29.4 m/s

Acceleration due to gravity (g) = 9.8 m/s²

Final velocity (v) = 0 m/s (at maximum height)

Time (t₁) take to reach the maximum height =?

v = u – gt (since the stone is going against gravity)

0 = 29.4 – (9.8 × t₁)

0 = 29.4 – 9.8t₁

Collect like terms

0 – 29.4 = – 9.8t₁

–29.4 = –9.8t₁

Divide both side by –9.8

t₁ = –29.4 / –9.8

t₁ = 3 s

Next, we shall determine the time taken for the stone to reach the ground from the maximum height reached by the stone. This can be obtained as follow:

Maximum height (H) from the ground = 34.3 + 44.1 = 78.4 m

Acceleration due to gravity (g) = 9.8 m/s²

Time (t₂) taken for the stone to reach the ground from the maximum height reached by the stone =?

H = ½gt₂²

78.4 = ½ × 9.8 × t₂²

78.4 = 4.9 × t₂²

Divide both side by 4.9

t₂² = 78.4 / 4.9

t₂² = 16

Take the square root of both side

t₂ = √16

t₂ = 4 s

Finally, we shall determine the total time taken for the stone to reach the ground. This can be obtained as follow:

Time (t₁) take to reach the maximum height = 3 s

Time (t₂) taken to reach the ground from the maximum height reached by the stone = 4s

Total time (T) taken to reach the ground =?

T = t₁ + t₂

T = 3 + 4

T = 7 s

Thus, it took the stone 7 s to reach the ground.

You might be interested in
An object is pulled with a 85 N force inclined at 27° along a horizontal surface ABC
OLEGan [10]

Answer:

m = 15.15 kg

Explanation:

Newton's Second Law of motion states that when an unbalanced force is applied on a body, an acceleration is produced in it in the direction of force. The component of force along the horizontal direction here, will be given by the Newton's Second Law as:

Fx = ma

F Cosθ = ma

where,

F = Magnitude of Force = 85 N

θ = Angle with horizontal = 27°

m = mass of object = ?

a = acceleration of object = 5 m/s²

Therefore,

85 N Cos 27° = m(5 m/s²)

m = 75.73 N/5 m/s²

<u>m = 15.15 kg</u>

6 0
3 years ago
What type of OS is very fast and small, and is often embedded, or built into the circuitry of a device?
Bezzdna [24]

Answer:

Real time operating system (RTOS)

Explanation:

  • Real time operating system is an operating system software which is used for the real-time applications that processes the data as soon as the input comes to the system.

It is very fast because it processes the data without any buffer delays.

  • In RTOS the scheduler provides a deterministic time which is predicted for the execution pattern. In a real-time operation the system must respond to each sequence of execution within a certain time frame which is the deadline for the operation so that the next inline process can be executed. Hence it is used in embedded systems and circuitry devices.
7 0
3 years ago
A block of mass m1 = 290 g is at rest on a plane that makes an angle θ = 30° above the horizontal. The coefficient of kinetic fr
GrogVix [38]

Answer:

The speed of the block when is fallen 30cm

v=0.726\frac{m}{s}

Explanation:

∑F= (m2)g - ƒ - (m1)g*sin(θ) = (m1)a

g = 9.81 m/s²

ƒ  = μN = μ(m1)g

(m2)*g - u*(m1)*g - (m1)*g*sin(\alpha ) = (m1)*a

(0.200)(9.81) - (0.1)(0.290)(9.81) - (0.290)(9.81)sin(30°) = (0.290)a

(0.200kg)(9.81\frac{m}{s^{2}}) - (0.1)(0.290kg)(9.81\frac{m}{s^{2}}) - (0.290kg)(9.81\frac{m}{s^{2}})sin(30°) = (0.290kg)*a

0.511101=0.29*a\\a=0.879\frac{m}{s^{2} }

v_{f}^{2}=v_{o}^{2}+2*a(x_{f}^{2}-v_{o}^{2})\\v_{o}=0\\v_{o}=0\\v_{f}^{2}=2*a(x_{f})\\v_{f}=\sqrt{2*a(x_{f})}\\v_{f}=\sqrt{2*0.879\frac{m}{s^{2}}*0.30m} \\v_{f}=0.726 \frac{m}{s}

5 0
4 years ago
What would happen if Earth absorb all the heat from the Sun
SCORPION-xisa [38]
Every living thing would die
3 0
4 years ago
water can be thought of as a mass of moving particles. What evidence supports this idea? How does this idea help to explain boil
Illusion [34]

Answer:

May 29, 2020 — Using activities like POE (Predict-Observe-Explain) can help  think about and then question their existing ideas.

Explanation:

YAY

7 0
3 years ago
Other questions:
  • Formulating a Hypothesis: Part I Since the investigative question has two variables, you need to focus on each one separately. T
    5·2 answers
  • An object with high momentum ______.
    7·1 answer
  • Viewed moving objects from pond water under his microscope and named them “animalcules”.
    10·1 answer
  • What is a factor that does not change because other values have changed?
    10·1 answer
  • What kind of chemical reaction does the chemical equation sodium + chlorine → sodium chloride represent?
    6·2 answers
  • Describe the concept of orbital motion as it relates to the earth., moon and sun
    14·1 answer
  • Two children of mass 20 kg and 30 kg sit balanced on a seesaw with the pivot point located at the center of the seesaw. If the c
    5·1 answer
  • if a moving object travels north for a distance of 105 m in 22 sec, what is it’s speed and velocity ?
    8·1 answer
  • During the process of mountain building, earthquakes sometimes occur along continental-continental convergent boundaries. Which
    12·2 answers
  • How have workers in the past tried to better their lives? by forming "working schools" where they could continue and improve the
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!