Answer:

Step-by-step explanation:
From the question we are told that:
Waiting time for a container of the wheels during production 
Average processing time is 
Wheel per container 
Total wheel per day 
Policy variable of
Generally the equation for Total number of container
is mathematically given by

Where
Total time 

Therefore





Therefore the number of Kanban containers needed for the wheels is

Answer:
The value of 4 is an input of the function
Step-by-step explanation:
Let
x -----> the independent variable or input value
y ----> the dependent variable or output value
we know that
Looking at the graph
The domain (input values) of the linear function is equal to the interval
[1,∞)

All real numbers greater than or equal to 1
The range (output values) of the linear function is equal to the interval
(-∞,3]

All real numbers less than or equal to 3
therefore
The value of 4 is an input of the function
Answer:
= 
Step-by-step explanation:
Answer:
I think it would be b
Step-by-step explanation:
He doesn't want to spend more than 50 and he needs 8 for lunch so the 8 dollars and the book can't go over 50.
Its either a or b im just not sure if its plus 8 or minus 8. sorry
Is there a picture or options to this ?