Answer:
Fourth option: 30 days
Step-by-step explanation:
We three path to complete the project:
Path A:
A1 → A2 → A3
10 days → 8 days → 9 days = 27 days
Path B:
B1 → B2 → B3
2 days → 7 days → 3 days = 12 days
Path C:
C1 → C2 → C3
10 days → 8 days → 12 days = 30 days
Then the duration of the critical path is 30 days, we can't conclude the project until each path has finished
<h3>Answer: 32 degrees</h3>
================================
Work Shown:
Inscribed angle theorem
arc measure = 2*(inscribed angle)
arc ABC = 2*(angle D)
arc ABC = 2*(35)
arc ABC = 70 degrees
-------------
break arc ABC into its smaller pieces
(minor arc AB)+(minor arc BC) = arc ABC
(38)+(minor arc BC) = 70
minor arc BC = 70-38
minor arc BC = 32
Answer:
8 units by 10 units
Step-by-step explanation:

24% of the questions were not answered correctly
Answer:
x=0.450765 or x=−0.950765
Step-by-step explanation:
14x² + 7x - 6
→ Find the product, sum and factors
Product = -6
Sum = 7
Factors = No factors
→ Since there are no factors utilise the quadratic formula

→ List the values of a, b and c
a = 14
b = 7
c= -6
→ Substitute into the formula

→ Simplify
x=0.450765 or x=−0.950765