First, subtract both sides by 25:
x^2 - 6x = -25
Because we're completing the square, we subtract both sides by 9:
x^2 - 6x - 9 = -34
(x - 3) = 5.831 (about)
x = 8.831
Step-by-step explanation:
All you need to do is divide cost by mile since they already factored in the additional $3 for you.
1. 8/5 = $1.60
2. 11/8 = $1.375 = $1.38
3. 23/20 = $1.15
Answer:17 dollars per hour per hour
Step-by-step explanation:
Hope this helps
2x X 54 is going to be 108x
since both are positive you will get a positive #
54 X 2 is 108
Answer:
Only 10 base units to learn
Step-by-step explanation:
The metric system is a decimal based system developed to be universally acceptable by making use of base units from obtained from nature and the use of prefixes for multiples and submultiples of the base units, decimal ratios, which allows easy representation of quantities, as well as having a coherent structure of base and derived units which are obtained from the base units
During conversion in the metric system, which is decimal based, it is only required to move the decimal point
The prefixes which are used to specify multiples and submultiples are the same through out
The decimal system is based on the powers of ten
The number of base units to learn are 7 including; 1. Meter (m), 2. Kilogram (kg), 3. Second (s), 4. Ampere (A), 5. Kelvin (k), 6. Candela (cd), and 7. mole (mol)
Therefore the metric system has several advantages that include all of the following except; Only 10 base units to learn