Given:
3, -2
1, 2
-1, -4
-1, 2
The format is (x,y)
The domain is all the x-values while range is all the y-values.
domain: (3,1, -1,-1) 2nd option given.
Answer:
A) Pd = 13/28
B) Pd = 7/16
Step-by-step explanation:
Given;
Drama = 2
Comedy = 1
Science fiction = 5
Total = 8
a) The probability of selectingat least one drama movie Pd;
Pd = 1 - Pd'
Without replacement;
Probability of not selecting a drama movie Pd' is;
Pd' = 6/8 × 5/7 = 15/28
Pd = 1 - 15/28
Pd = 13/28
b) with replacement;
Probability of not selecting a drama movie Pd' is;
Pd' = 6/8 × 6/8 = 9/16
Pd = 1 - 9/16
Pd = 7/16
Answer:
The firstgear needs to make five revolutions in order for the marks to line up again.
Step-by-step explanation:
Answer:
6:10.
Step-by-step explanation:
4 : 40 + 1 : 30 = 5 : 70
because 60 minutes make an hour and on the minutes side has more than 60, we have to minus 60 minutes and carry the one hour to the other side which is the Hour side.
5 : 70........ minus 60 to get 10.
5 + 1 to get 6.
therfore it is 6 : 10
It costs $3.63 more for the gold die than the gold plated die.
The volume of each half of the die is given by the formula
V=1/3s³.
This means the total volume is V = 2(1/3s³) = 2(1/3(2³)) = 16/3 = 5.33 mm³.
For the solid gold die, we know that it weighs 0.02g per mm³:
5.33(0.02) = 0.1066g
Gold costs $40.38 per gram:
40.38(0.1066) = $4.30
For the plastic die, plastic weighs 0.01 g per mm³:
0.01(5.33) = 0.0533g
Plastic costs $10 per gram:
0.0533(10) = 0.533 ≈ $0.54.
We also need to find the surface area, as it will be painted. Each face is an equilateral triangle; the area of a triangle is given by the formula
A = 1/2bh
We need to use the Pythagorean theorem to find the height. The height will be one leg and 1/2 of the base will be the other; the slanted side will be the hypotenuse:
h² + (1/2(2))² = 2²
h² + 1² = 2²
h² + 1 = 4
h² = 3
h = √3
The area of the triangle would then be A = 1/2bh = 1/2(2)(√3) = √3. There are 8 such faces on the die, so the total surface area would be 8√3 = 13.86mm².
Paint costs $0.01 per mm²:
13.86(0.01) = 0.1386 ≈ $0.14
Together the cost for the plastic is 0.14+0.53 = $0.67.
The difference between it and the cost for the gold die is 4.30 - 0.67 = $3.63.