The expected values of the binomial distribution are given as follows:
1. 214.
2. 21.
3. 31.
<h3>What is the binomial probability distribution?</h3>
It is the <u>probability of exactly x successes on n repeated trials, with p probability</u> of a success on each trial.
The expected value of the binomial distribution is:
E(X) = np
For item 1, the parameters are:
p = 3/7, n = 500.
Hence the expected value is:
E(X) = np = 500 x 3/7 = 1500/7 = 214.
For item 2, the parameters are:
p = 0.083, n = 250.
Hence the expected value is:
E(X) = np = 250 x 0.083 = 21.
For item 3, the parameters are:
p = 1/13, n = 400.
Hence the expected value is:
E(X) = np = 400 x 1/13 = 31.
More can be learned about the binomial distribution at brainly.com/question/24863377
#SPJ1
Answer: point estimate = 3.88
Margin of error = 0.63
Step-by-step explanation:
Confidence interval is written in the form,
(Point estimate - margin of error, Point estimate + margin of error)
The sample mean, x is the point estimate for the population mean. Let m represent the margin of error. Since the confidence interval is given as (3.25 , 4.51), it means that
x - m = 3.25
x + m = 4.51
Adding both equations, it becomes
2x = 7.76
x = 7.76/2
x = 3.88
Substituting x = 3.88 into x + m = 4.51, it becomes
3.88 + m = 4.51
m = 4.51 - 3.88
m = 0.63
C = 22d is the correct answer because for every day the cost increases by 22 so two days mean the cost is equal to 22 (2)
I think it's equal to 1 because every expression with the exponent of zero is equal to 1, idk for sure though