Been a bit since i’ve done this kind of problem.
X+4=20
X is the number of hours needed to work, while 4 is the hours already there.
A. 2(l)+2(w)=P
B. lw=A
C. 2(14) + 2(8) = P
28 + 16 = P
44 = P
D. Im going to assume the rectangle shown is the same as C...
14 x 8 = A
112=A
Hope this helps!
Hi! I know for sure that a and d are equivalent to the expression which is not what you are looking for. This is because 11 times 8 gives you the 88 on a and if you multiply the 5 also by 8 you get 40 so a is not the answer. The reason I multiply both by the same number and got the equivalency is because, "What you do to one side, you do to the other." Same thing with d. My answer would be B because you can't change the variable to a different number. You can't just give the five the y and make it mean the same. The answer is B.
Answer:
t(h)= (h-200)/-4.9
The time to reach a height of 50 meters is 30.6 seconds
Step-by-step explanation:
To express t as a function of height (h) we must transform the equation below:
h=200-4.9t
h-200=-4.9t
(h-200)/-4.9=t
t(h)= (h-200)/-4.9
To find the time to reach a height of 50 meters, we must replace this value on the new equation:
t(h)=50-200/-4.9
t(h)= 30.612
The time to reach a height of 50 meters is 30.6 seconds