M=log I / S
if M=6, 6=logI/S and then 10^6=I/S, so we get I=S <span>x 10^6, we assume that
</span>A=S x 10^6
if M=8, so, 8=logI/S and then 10^8=I/S, so we get I= S x 10^8=A=S x 10^6x10^2
since A=S x 10^6, so I= <span>A x10^2, </span><span>an earthquake with a magnitude of 8 is 10² stronger than an earthquake with a magnitude of 6.</span>
Answer:
C
Step-by-step explanation:
Answer:
x=$2.50, y=$4.00
Step-by-step explanation:
Let x=cost of the water slide
Let y=cost of the ferris wheel
System of equations:
3x+3y=19.50
2x+3y=17.00
Subtract the 2nd from the 1st to get:
x=2.50
Now plug into first equation to get:
3(2.50)+3y=19.50 so y=4.00
Check in 2nd equation:
2(2.50)+3(4) = 5+12 = 17
First replace x and y by 3 and 4.
(3*(x)+1)/(4*(y)^2)
((3*(3))+1)/(4*((4)^2)) = (9+1)/(4*16) = 10/64 = 5/32.
5/32 is your answer.
Please mark me as brainliest!
Answer:
Max 0.09B+0.2s
B>=0.6 Bond fund minimum
0.06B+0.2S>=0.085 Minimum Return
B+S=1 All funds invested
B,S>=0
Step-by-step explanation:
(a) In linear programming, the mathematical model and the linear objective function set of linear constraints the variables are not negative.
B=% funds invested in the bond fund
S=% of funds invested in the stock fund
Max 0.09B+0.2s
B>=0.6 Bond fund minimum
0.06B+0.2S>=0.085 Minimum Return
B+S=1 All funds invested
B,S>=0
Solve the above by using the graphical solution procedure?
steps to solve the graphs
1)draw the graphs, making sure the constraints are consider
2)consider all the constraints
3)draw the objective function line to the decision variables to
4) place the parallel lines of objective function towards larger objective function
5) consider as optimal function the feasible solution on the objective function line with the largest value ia