94
(85+89+92+x)/4 = 90
(266+x)/4 = 90
(Multiply by 4 on each side to get rid of it)
266+x=360
(subtract 266 from each side)
x = 94
Answer:
-4(5-x)
Step-by-step explanation:
Answer:
4 hours. 1 3/4 is about 2, and 2 1/4 rounds to 2. 1/4 would round to 0, but it would not affect the estimate's accuracy much because we rounded up by 1/4 on 1 3/4 already. Philipe spent about 4 hours on activities.
Step-by-step explanation:
B = 120 because it is in your sum
A=1/2bh
Data:
a=192 mm²
h=12 mm
therefore:
192 mm²=1/2(b)(12 mm)
192 mm²=6b mm
b=192 mm²/6 mm
b=32 mm
Answer: the measure of the base is 32 mm