Answer:
Area= 452.16 cm2
Step-by-step explanation:
12 x 12 = 144
144 x 3.14 = 452.16
Answer:
Step-by-step explanation:
A box plot is the diagrammatic representation of the five number summary. It includes 5 items:
The minimum.
Q1 = the first quartile or the 25% mark.
The median.
Q3 = the third quartile or the 75% mark.
The maximum.
Rearranging the data in ascending order, it becomes
169, 163, 153, 166, 149, 148, 146, 145, 152, 163
145, 146, 148, 149, 152, 153, 163, 163, 166, 169
Minimum = 145
Maximum = 169
Median = (152 + 153)/2 = 152.5
The median divides the data into two equal halves. The middle of the lower halve is Q1 while the middle of the upper halve is Q3
Q1 = 148
Q3 = 163
The diagram of the box plot is shown in the attached photo
The percent would be 560%
Answer:
True
Step-by-step explanation:
Given that:
M = 27, sample of n = 36 scores, µ = 30 and σ = 18.
The z score is used in statistics to determine by how many standard deviations the raw score is above or below the mean. If the z score is positive, the raw score is greater than the mean and if the z score is negative the raw score is less than the mean. The z score is given as:

Given that M = 27, this means that x = 27. Therefore:

This sample mean corresponds to a z-score of z = –1.00.