1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
liberstina [14]
2 years ago
6

Write an equation in slope intercept form with a slope of 1/2 and y-intercept of -7

Mathematics
1 answer:
erastova [34]2 years ago
3 0

Answer:

Slope intercept form:y=mx+c

y=1/2x-7

You might be interested in
Without graphing, is the system independent, dependent, inconsistent? {12x=3y=12 y=-4x+5
Alla [95]
Okay so you out them into the form of y=mx+b. since equation 2 is already like that you need to do it to equation 1. which is y=-4x+4. graph both equations. if it has a solution (1 point where the two lines meet) it is consistantly and independent. if they are parallel lines and the solution is 0 the system is inconsistent and the lines are dependent. if it's the same line they are consistent and dependent. the line is not the same since the y intercept is different. the slope is the same though which tells us its parallel. so the system has a solution of 0 and is inconsistent and the lines are independent.
7 0
3 years ago
Are the ratios 18:6 and 3:1 equivalent?
garik1379 [7]

Answer: no

Step-by-step explanation: here are all the ratios equivalent to 18:6 18 : 636 : 1254 : 1872 : 2490 : 30108 : 36126 : 42144 : 48162 : 54180 : 60198 : 66216 : 72234 : 78252 : 84270 : 90288 : 96306 : 102324 : 108342 : 114360 : 120378 : 126396 : 132414 : 138432 : 144450 : 150468 : 156486 : 162504 : 168522 : 174540 : 180558 : 186576 : 192594 : 198612 : 204630 : 210648 : 216666 : 222684 : 228702 : 234720 : 240738 : 246756 : 252774 : 258792 : 264810 : 270828 : 276846 : 282864 : 288882 : 294900 : 300918 : 306936 : 312954 : 318972 : 324990 : 3301008 : 3361026 : 3421044 : 3481062 : 3541080 : 3601098 : 3661116 : 3721134 : 3781152 : 3841170 : 3901188 : 3961206 : 4021224 : 4081242 : 4141260 : 4201278 : 4261296 : 4321314 : 4381332 : 4441350 : 4501368 : 4561386 : 4621404 : 4681422 : 4741440 : 4801458 : 4861476 : 4921494 : 4981512 : 5041530 : 5101548 : 5161566 : 5221584 : 5281602 : 5341620 : 5401638 : 5461656 : 5521674 : 5581692 : 5641710 : 5701728 : 5761746 : 5821764 : 5881782 : 5941800 : 600

https://goodcalculators.com/ratio-calculator/

© 2015-2021 goodcalculators.com

3 0
2 years ago
Read 2 more answers
3x + 2y = 5
Firlakuza [10]

Answer:

I am guessing the 1st one.

Step-by-step explanation:

8x does NOT equal 12 I believe. I am sorry if I am incorrect

7 0
3 years ago
In a process that manufactures bearings, 90% of the bearings meet a thickness specification. A shipment contains 500 bearings. A
vredina [299]

Answer:

c) P(270≤x≤280)=0.572

d) P(x=280)=0.091

Step-by-step explanation:

The population of bearings have a proportion p=0.90 of satisfactory thickness.

The shipments will be treated as random samples, of size n=500, taken out of the population of bearings.

As the sample size is big, we will model the amount of satisfactory bearings per shipment as a normally distributed variable (if the sample was small, a binomial distirbution would be more precise and appropiate).

The mean of this distribution will be:

\mu_s=np=500*0.90=450

The standard deviation will be:

\sigma_s=\sqrt{np(1-p)}=\sqrt{500*0.90*0.10}=\sqrt{45}=6.7

We can calculate the probability that a shipment is acceptable (at least 440 bearings meet the specification) calculating the z-score for X=440 and then the probability of this z-score:

z=(x-\mu_s)/\sigma_s=(440-450)/6.7=-10/6.7=-1.49\\\\P(z>-1.49)=0.932

Now, we have to create a new sampling distribution for the shipments. The size is n=300 and p=0.932.

The mean of this sampling distribution is:

\mu=np=300*0.932=279.6

The standard deviation will be:

\sigma=\sqrt{np(1-p)}=\sqrt{300*0.932*0.068}=\sqrt{19}=4.36

c) The probability that between 270 and 280 out of 300 shipments are acceptable can be calculated with the z-score and using the continuity factor, as this is modeled as a continuos variable:

P(270\leq x\leq280)=P(269.5

d) The probability that 280 out of 300 shipments are acceptable can be calculated using again the continuity factor correction:

P(X=280)=P(279.5

8 0
3 years ago
ΔMNP is an isosceles triangle with MN ≈NP. If ∠ M = 3x + 1 and ∠ N = x - 11. What is the measure of ∠P?
denis23 [38]
I hope this helps you

4 0
3 years ago
Read 2 more answers
Other questions:
  • If m is the number of magic markers, which variable expression represents the phrase below?
    11·2 answers
  • Need help asap please
    7·1 answer
  • Explain how an estimate helps you to place the decimal point when mutiplyning 3.9 times 5.3
    6·2 answers
  • Put the following fractions in their simplest forms 9/36=?
    8·1 answer
  • What is the slope of the line (-4,-4) and (1,4)
    6·2 answers
  • Average of -3,0,7,-2
    11·2 answers
  • Find the height of the cylinder.
    11·1 answer
  • Hello, I need help. thank you
    6·2 answers
  • Esme takes the bus to university 40 times during a term to relative frequency of the bus being late is 0.3
    10·2 answers
  • I still don't get it.
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!