1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
vlada-n [284]
3 years ago
5

Sasha ran 2/3 of a 27km race before she stopped to walk. How

Mathematics
1 answer:
dimaraw [331]3 years ago
3 0

Answer:

2/3 of 27=18 km

Step-by-step explanation:

You might be interested in
Evaluate the piece wise function for the given values of x by matching the domain values to the range values.
Ugo [173]

Answer:

- 5 (x = 1)

Step-by-step explanation:

When x equals 1, it fits in the piece where x < 3. The equation for that interval is -x - 4. We can substitute 1 into that equation to get:

- 1 - 4

- 5

8 0
3 years ago
Samantha ate 3/5 of the pumpkin pie Sean ate 2/10 of the pie how much did they leave for Richard
gavmur [86]

If you simplify 2/10 to get 1/5 then you can add the two together to get 4/5, so that would leave 1/5 for richard

4 0
3 years ago
A photo frame in the shape of a quadrilateral has one diagonal longer than the other. Is it a Rectangle? Why
julsineya [31]

Answer:

  • 80°

Step-by-step explanation:

A rectangle has same opposite sides and 4 right angles as property of a rectangle.

The photo frame has different diagonal lengths

It makes opposite sides different, therefore it is not a rectangle

<u>Given angles (x - 20) and (x + 40) are consecutive interior angles which add up to 180°</u>

  • x - 20° + x + 40° = 180°
  • 2x + 20° = 180°
  • 2x = 160°
  • x = 80°
3 0
3 years ago
A contractor requires a cement mix that is 70% sand and 30% cement. He has 1400 kg of a cement mix that is 80% sand and 20% ceme
aleksandr82 [10.1K]

Answer:

added cement = 200 kg

Step-by-step explanation:

Sand = 0.8*1400

Sand = 1120 kg

If 1120 kg of sand represents the total sand in the 8:2 mixture.

We have to create the equation of the 7:3 mixture as follows.

The sand amount continues the same but the total amount of the mixture and cement will change.

0.7*mixture_mass + 0.3*mixture_mass = mixture_mass

By replacing values, we have:

1120 kg + 0.3*(1400 kg + added cement)= 1400 kg + added cement

added cement = 200kg

8 0
3 years ago
I need help with this! ASAP!
vovangra [49]
The first one. 
The other ones have nothing to prove it. 
7 0
3 years ago
Other questions:
  • Pls help ASAP
    11·2 answers
  • Which of the following cross sections cannot be produced by slicing a right rectangular prism? A. pentagon B. circle C. rectangl
    12·2 answers
  • If the subtrahend is 9 and the difference is 8 what is the minuend
    12·1 answer
  • The rectangle below has an area of 70y^8+30y^6
    13·1 answer
  • John works Monday to Friday. He buys his lunch on his way to work. Each day John buys a sandwich, a bottle of water and a bag of
    9·1 answer
  • What is the answer to this?
    8·2 answers
  • Please solve these 3 questions
    7·1 answer
  • What statements are true and what statements are false?
    6·1 answer
  • Using 3.14 for, what is the volume of a ball with a diameter of 7 centimeters?
    7·1 answer
  • Weather forecasters use a barometer to measure
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!