There actually isn't anything to 'work'. There's no question there.
The function simply describes the relationship between two numbers.
It says that whatever you pick for the first number, the second number is
(-4 times the square of the first one) plus (7 times the first one) plus (6) .
Your teacher may have assigned you something to do with the function,
like draw the graph of it, or find its maximum value (2.9375), or find where
it crosses the x-axis (2.381 and -0.63) or the y-axis (6).
But we can't tell what you've been assigned to do with it. The function alone,
just as you've posted it, isn't asking a question, and doesn't call for any work.
Answer:
B
Step-by-step explanation:
First thing to do here is to calculate the z-score
Mathematically;
z-score = (x-mean)/SD
here, x = 130, mean = 120 and SD = 10
Substituting these values
z-score = (130-120)/10 = 10/10 = 1
So the probability we want to calculate is;
P(z ≥ 1) = 1 - P(z <1)
From standard score table, P(z <1) = 0.15866
P(z ≥ 1) = 1-0.15866 = 0.84134
Answer:
well, 11 days
Step-by-step explanation:
if you were to put take out the y and put 2600 in the y place (2600=235x+15)
you solve that, and will come to 11 days
further explaining:
2600-15 = 2585
2585 / 235 = 11
( I'm not sure if this is right, the question is worded weird and almost doesn't make sense)
but I think it is looking for substitution
Hope this helps!
Answer:
0.5 m
Step-by-step explanation:
Given that the dimensions of the garden are 15 meters by 20 meters.
The area of the new garden (original garden + stone placed around the perimeter) is 336m².
Let d be the width of the border having stepping stones as shown in the figure. The shaded region in the figure is the area having stepping stones.
The area including the shaded region 

As the width of the stone border can't be a negative value, so taking the positive value.
Hence, the width of the stone border is 0.5 m.
So, the wi
2x+18+1-1 works if that's all you want