1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Feliz [49]
3 years ago
7

What is the vertical change from point a to point b

Mathematics
1 answer:
kakasveta [241]3 years ago
8 0

Answers:

  • Vertical change = 1
  • Horizontal change = 2
  • Rate of change = 0.5

====================================================

Explanation:

Imagine that we have point A as a buoy in the water. So the horizontal line through 1 on the y axis is the water line. How much should the water line go up so that points A and B are on the same horizontal level? That would be 1 unit up. This is the vertical change. Another term for this is "rise".

After the water goes up, and A and B are on the same level, the question is now: how far to the right do we go from A to B? That would be 2 units. This is the horizontal change. Another term for this is "run".

Using those two values, we can compute the rate of change aka slope.

slope = rise/run = 1/2 = 0.5

So each time we go up 1 (rise) we move to the right 2 (run).

The slope is positive since we're moving uphill while moving to the right.

You might be interested in
Juana had a board that was 54 inches long. She cut off 22.5 inches for a project. How may inches of the board remain?
hichkok12 [17]

Answer:

Step-by-step explanation:

4+2=5

-2323

asdasd

4 0
4 years ago
Read 2 more answers
After a reflection over y=-x, the x-coordinate of R' is __
Dominik [7]
(-9,-4) would be the Coordinate if flipped over the x axis i think.
Sorry if it’s wrong
:(
3 0
3 years ago
Help please!Gary attended a Halloween Carnival last night. He paid $8 for admission and went on 15 carnival rides.
dusya [7]

Answer:

3.9

Step-by-step explanation: divide when he went for addimition 8 dollars 15 carnival's and total of 31.25 .    31.25/15

4 0
3 years ago
1.) You plan to cut a board into 3 pieces to repair part of a railing. You are going to cut the two ends of the board off into t
rjkz [21]

Here we have 3 general algebraic problems that we need to solve. Using simple reasoning we can solve these.

1) You will buy a board of length L.

You will cut two pieces that are 1.4 ft long.

So at this point, the length of the board piece is:

L - 1.4ft - 1.4ft = L - 2.8ft.

Now, you want this to be 1.17 times longer than 1.4ft, then we need to solve:

L - 2.8ft. = 1.17*(1.4ft) = 1.638ft

L = 1.638ft + 2.8ft = 4.438ft

Rounding to the nearest tenth, we get:

L = 4.4 ft

This is the length of board you should buy.

2) Here we know:

You pay $0.13 per KW-h

This month, you pay a total of $83.96

The total number of  KW-h you used is equal to the quotient between the total amount you paid and the price of a single KW-h, this is:

N = $83.96/$0.13  = 645.85

This month you used 645.85 KW-h in your home.

3) Here we know:

You pay $0.09 per KW-h.

Running the bulb for one hour consumes 0.06 KW-h

So, if you leave one of these lights on all day (24 hours) it would consume:

24*0.06 KW-h = 1.44 KW-h

If you instead leave 5 of these bulbs, you will consume 5 times that amount:

5*1.44 KW-h = 7.2 KW-h

This is in one single day, if you do this for 30 days, the total consumption is:

30* 7.2 KW-h = 216 KW-h

And you pay $0.09 for each one of these, then the cost is 216 times $0.09

Cost = 216*$0.09 = $19.44

If you want to learn more about algebra, you can read:

brainly.com/question/24382046

3 0
3 years ago
The probability that z is greater than -1.8
Lerok [7]

Answer:

0.964

Step-by-step explanation:

It's easier to approach this problem if you find the prob. that z is less than -1.8 and then subtract your result from 1.00.

The prob. that z is less than -1.8 can be found using any calculator with probability and statistic functions.

The prob. that z is less than -1.8 = normcdf(-100,-8) = 0.036.  Here "cdf" stands for "cumulative probability density function)," -100 is far to the left of z = -1.8, and the result (0.036) is the area under the standard normal probability density curve to the left of z = -1.8.

Finally, subtract this 0.036 from 1.000, obtaining 0.964.  This is the probability that z is greater than -1.8.

7 0
3 years ago
Other questions:
  • How much will a registered retirement savings deposit of $13 500.00 be worth in
    15·1 answer
  • What is the answer to -6+7x-6x=3
    15·1 answer
  • The weight for crates of apples is normally distributed with a mean weight of 34.6 pounds and a standard deviation of 2.8 pounds
    14·1 answer
  • Which of the values {1, 2, 3, 4} is the solution to the equation 3x + 3 = 15? Group of answer choices 3 1 4 2
    10·1 answer
  • You drop a ball from a height of 1.5 meters. Each curved path has 71% of the height is the previous path.
    6·2 answers
  • Given that a random variable X has a geometric distribution that X- Geometry 0.67. Find the mean​
    11·2 answers
  • Si A es D.P. con B e I.P. a Vc, cuando A = 4; B =8 y C = 16. Halla A cuando B =12 y C = 36.​
    13·1 answer
  • The graphs below have the same shape. What is the equation of the red<br> graph?
    7·1 answer
  • Convert 11 from base 10 to base 2
    14·1 answer
  • 9 + b = ? if b = 3 what is the answer
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!