Whenever the VM does not need to be access at a known address by other network nodes.
Answer:
The answer to this question can be described as follows:
Explanation:
Relational data model:
The use of data tables to organize sets of entities into relationships requires a relational data model. this model work on the assumption, which is a primary key or code, that is included in each table configuration. The symbol for "relational" data links and information is used by other tables.
Model Design:
This model is used for database management, it consists of structure and language consistency. It is design in 1969.
Importance of data model:
This provides a common standard for processing the potentially sound data in machines, that was usable on almost any one device.
Big Data:
It moves to locate new and innovative ways to handle large volumes of authentication tokens and to gather business insights when offering high efficiency and usability at an affordable cost at the same time.
Answer:
A. taxonomy
Explanation:
A taxonomy can be used to hierarchically represent a classification for a given set of objects or documents.
Answer:
optical
Explanation:
The earliest of these was the magnetic device. Computer systems began with magnetic storage in the form of tapes (yes, just like a cassette or video tape). These graduated to the hard disk drive and then to a floppy disk.
Answer:
The formula to enter in E14 is as follows:
=DAYS(D14,$E$10)
Explanation:
Required
Formula to calculate the number of days between E10 and D14
The syntax to do this is:
=DAYS(end_date,start_date)
So, we have:
=DAYS(D14,E10)
The question requires a mix of relative and mixed references because cell E10 will be constant in calculating the difference for dates in other cells.
In other words, the initial date is constant for all
So, the update formula is:
=DAYS(D14,$E$10)
Notice the $ between in E10; this represents mixed referencing
When dragged to E15 till E68, the formulas in the respective cells will be:
=DAYS(D15,$E$10) .............................. =DAYS(D68,$E$10)