Answer:
CED = 117
Step-by-step explanation:
21x +21 = 7x +49
21x - 7x = 49 - 21
14x = 28
x = 28/14
x = 2
7x + 49
=7(2) + 49
=14 + 49
=63
180 -63 = 117
CED= 117
Answer:
4,300
Step-by-step explanation:
Is 289 closer to 300 or 200?
V
[300] [200]
Add the 4
= 4, 300
- I . A -
Total cost for tiles and paints is $924.
Step-by-step explanation:
We have been given that a community hall is in the shape of a cuboid. The hall is 40m long 15m high and 3m wide.
The paint will be required for 4 walls and ceiling.
Let us find area of walls and ceiling.
Therefore, the area of walls and ceiling is 1410 square meters.
Given: Cost for 10 litre of paint is $10 and 10 litre paint covers 25 square meter. Therefore,
Therefore, the total painting cost is $564.
Tiles will be required for floor. Let us find the area of floor.
Given: 1m squared floor tiles costs $3. So,
Therefore, the total cost for tiles is $360.
Now let us find combined total cost of tiles and paint.
Therefore, the combined total cost of tiles and paint is $924.
First day: 25% × 100 = 25 ( miles)
Second day : the remaining distance is 100 - 25 = 75 ( milesl
Third day: 40% × 75 = 30
25 + 75 + 30 = 130 (miles)
Answer:
a. Diego
b. Lin
Step-by-step explanation:
a. Diego
b. Lin
It's pretty easy just do some subtraction.
Actually look and pay attention in class this is like grade 1 math.