Answer:
As both the mean and standard deviation are in the desired ranges, the tool passes the technical control.
Step-by-step explanation:
Mean of the batch:
The mean of the batch is the sum of all values divided by the number of items. So

Mean in the desired interval.
Standard deviation:
Square root of the sum of the difference squared between each term and the mean, divided by the number of items. So

As both the mean and standard deviation are in the desired ranges, the tool passes the technical control.
This question can be approached using the present value of annuity formula. The present value of annuity is given by

, where: PV is the present value/amount of the loan, P is the periodic (monthly in this case) payment, r is the APR, t is the number of payments in one year and n is the number of years.
Given that the<span> financing is for a new road bike of $2,500 and that the bike shop offers a 13.5% APR for a 24 month loan.
Thus, PV = $2,500; r = 13.5% = 0.135; t = 12 payments (since payment is made monthly); n = 2 years (i.e. 24 months)
Thus,
</span>

<span>
Therefore, his monthly payment is $119.44</span>
Answer:
18
Step-by-step explanation:
252 is a composite number. The exponents in the prime factorization are 2, 2, and 1. Adding one to each and multiplying we get (2 + 1)(2 + 1)(1 + 1) = 3 x 3 x 2 = 18. Therefore 252 has 18 factors.
Answer:
I'm currently having the same lesson.
Exponential form:
5⁶ = 15,625
The number next to the "log" symbol is the base, which is positioned down. Next to the base of the exponent is the result of the exponent.
The number after the equal sign is the exponent.
Check the image for better clarification.
Step-by-step explanation:
Answer:
The slope of the ramp is 1.
Step-by-step explanation:
See the diagram attached.
Here, AC = 15 ft. and ED = 5 ft. while AE = 10 ft.
Then, EC = (15 - 10) = 5 ft.
Now, considering the right triangle Δ EDC, if
is the inclination of the ramp, then 
Hence,
Therefore, the slope of the ramp is 1. (Answer)