1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
yuradex [85]
3 years ago
12

Suppose your school costs for this term were $4780 and financial aid covered 3/4 of that amount. How much did financial aid cove

r? How much do you still have to pay?
Mathematics
1 answer:
Alexandra [31]3 years ago
6 0

Answer: Amount covered by financial aid=$3,585

Amount left that you have to pay =$1,195

Step-by-step explanation:

School cost for the term = $4780

Amount covered by financial aid = 3/4 of $4780

= 3/4 x 4780

Amount left that you have to pay=School cost for the term -Amount covered by financial aid

= $4,780 - $3,585

Amount left that you have to pay =$1,195

You might be interested in
Which is the rate of change for the interval between 3 and 6 on the x-axis?
Anna71 [15]

Answer:

The correct answer is 2.

Step-by-step explanation:

To find this, first identify the ordered pairs at those two points. They would be (3, -2) and (6, 4). Then use the slope formula with those two points to find the rate of change.

m(slope) = (y2 - y1)/(x2 - x1)

m = (4 - - 2)/(6 - 3)

m = 6/3

m = 2

8 0
3 years ago
Read 2 more answers
Suppose that you are in charge of evaluating teacher performance at a large elementary school. One tool you have for this evalua
Strike441 [17]

Answer:

a) Standard error = 2

b) Range = (76.08, 83.92)

c) P=0.69

d) Smaller

e) Greater

Step-by-step explanation:

a) When we have a sample taken out of the population, the standard error of the mean is calculated as:

\sigma_m=\dfrac{\sigma}{\sqrt{n}}=\dfrac{10}{\sqrt{25}}=\dfrac{10}{5}=2

where n is te sample size (n=25) and σ is the population standard deviation (σ=10).

Then, the standard error of the classroom average score is 2.

b) The calculations for this range are the same that for the confidence interval, with the difference that we know the population mean.

The population standard deviation is know and is σ=10.

The population mean is M=80.

The sample size is N=25.

The standard error of the mean is σM=2.

The z-value for a 95% confidence interval is z=1.96.

The margin of error (MOE) can be calculated as:

MOE=z\cdot \sigma_M=1.96 \cdot 2=3.92

Then, the lower and upper bounds of the confidence interval are:

LL=M-t \cdot s_M = 80-3.92=76.08\\\\UL=M+t \cdot s_M = 80+3.92=83.92

The range that we expect the average classroom test score to fall 95% of the time is (76.08, 83.92).

c) We can calculate this by calculating the z-score of X=79.

z=\dfrac{X-\mu}{\sigma}=\dfrac{79-80}{2}=\dfrac{-1}{2}=-0.5

Then, the probability of getting a average score of 79 or higher is:

P(X>79)=P(z>-0.5)=0.69146

The approximate probability that a classroom will have an average test score of 79 or higher is 0.69.

d) If the sample is smaller, the standard error is bigger (as the square root of the sample size is in the denominator), so the spread of the probability distribution is more. This results then in a smaller probability for any range.

e) If the population standard deviation is smaller, the standard error for the sample (the classroom) become smaller too. This means that the values are more concentrated around the mean (less spread). This results in a higher probability for every range that include the mean.

6 0
3 years ago
Which is an equation of the line that contains the points (0,2) (4,0)
alekssr [168]

Answer:

Y= -1/2x+2

Step-by-step explanation:

First of all, remember what the equation of a line is:

y = mx+b

Where:

m is the slope, and

b is the y-intercept

First, let's find what m is, the slope of the line...

The slope of a line is a measure of how fast the line "goes up" or "goes down". A large slope means the line goes up or down really fast (a very steep line). Small slopes means the line isn't very steep. A slope of zero means the line has no steepness at all; it is perfectly horizontal.

For lines like these, the slope is always defined as "the change in y over the change in x" or, in equation form:

So what we need now are the two points you gave that the line passes through. Let's call the first point you gave, (0,2), point #1, so the x and y numbers given will be called x1 and y1. Or, x1=0 and y1=2.

Also, let's call the second point you gave, (4,0), point #2, so the x and y numbers here will be called x2 and y2. Or, x2=4 and y2=0.

Now, just plug the numbers into the formula for m above, like this:

m=

0 - 2

4 - 0

or...

m=

-2

4

or...

m=-1/2

So, we have the first piece to finding the equation of this line, and we can fill it into y=mx+b like this:

y=-1/2x+b

Now, what about b, the y-intercept?

To find b, think about what your (x,y) points mean:

(0,2). When x of the line is 0, y of the line must be 2.

(4,0). When x of the line is 4, y of the line must be 0.

Because you said the line passes through each one of these two points, right?

Now, look at our line's equation so far: y=-1/2x+b. b is what we want, the -1/2 is already set and x and y are just two "free variables" sitting there. We can plug anything we want in for x and y here, but we want the equation for the line that specfically passes through the two points (0,2) and (4,0).

So, why not plug in for x and y from one of our (x,y) points that we know the line passes through? This will allow us to solve for b for the particular line that passes through the two points you gave!.

You can use either (x,y) point you want..the answer will be the same:

(0,2). y=mx+b or 2=-1/2 × 0+b, or solving for b: b=2-(-1/2)(0). b=2.

(4,0). y=mx+b or 0=-1/2 × 4+b, or solving for b: b=0-(-1/2)(4). b=2.

See! In both cases we got the same value for b. And this completes our problem.

The equation of the line that passes through the points

(0,2) and (4,0)

is

y=-1/2x+2

4 0
3 years ago
Solve: <br>3x-5/2 +x+ 2x-3/3 = 5/6 - 3x/2​
Vlad [161]

Answer:

x = 26/45

Step-by-step explanation:

3 0
2 years ago
Read 2 more answers
I need help with making predictions with probability please help me correctly answer these questions.
Semmy [17]

Answer:

1. So the porpotion should be 25/100 = x/120

You have this because you know that 25% of the dogs who go to ABC veterinarian need a rabies booster. So 100% of the dog should be 120 dogs, and now our job is to find how many dogs make up 25% percent of the total number.

According to our porpotion, we have:

(120 . 25)/100 = 30 (dogs)

Another way of understanding this is that you have to find 25% of the total amount, so just take that total number and multiply it with 25% or 25/100 which is 0.25 as well, that's why we multiply it with 25 first and then divide it to 100 later.

2.

*I guess there is no need of explaining it

0.9 × 550 = 495

6 0
3 years ago
Other questions:
  • Foster’s answer to the question he wrote for Ranger was 7x + (–3), while Ranger’s answer was 7x – 3. They both checked their wor
    11·2 answers
  • Please help me with this geometry question. i attached an image.
    15·1 answer
  • Hershel had 100 baseball cards that he labeled from 1-100. He started with number
    7·2 answers
  • What is the range of the function in this table ?
    8·2 answers
  • The sum of two numbers is 148. The larger number is two less than three times the smaller. What are the two numbers?
    13·2 answers
  • Circle X with a radius of 6 units and circle Y with a radius of 2 units are shown. Circles X and Y are shown. Circle X has a rad
    11·1 answer
  • Dontae’s employer has offered him the following employment package. Salary $ 465,000 Health insurance 16,000 Dental insurance 1,
    13·1 answer
  • Evaluate \dfrac13m-1-\dfrac12n
    6·1 answer
  • How many ways can we pick three distinct integers from {1, 2, ..., 15} such that their sum is divisible by 3?
    14·1 answer
  • Find the measure of each angle​
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!