Electric power most likely. It can be a generator for a power plant if needed. Hope this helped. Sorry if it didn't.
The work done when a spring is stretched from 0 to 40cm is 4J.
What is work done?
Work done is the magnitude of force multiplied by displacement of an object. It is also the amount of energy transferred to an object when work is done on that.
The work done on the spring to stretch to 40cm is,
F = kx
where F is force, k is force constant.
k = F / x = 10 N / 20 * 10^-2 m = 50 N/m
W = 0.5 * k * (x)^2
where W = work done, k = force constant.
W = 0.5 x 50 x (40 x 10^-2)^2 = 4 J.
Therefore, the work done on the spring when it is stretched to 40cm is 4J.
To learn more about work done click on the given link brainly.com/question/25573309
#SPJ4
Answer:
Gravitational
Tension
Normal
Friction.
Explanation:
The forces acting on the sled are:
Tension: the tension from the rope, this is the force that "moves" the sled.
Friction: kinetic friction between the sled and the ground as the sled moves.
There are another two forces that also act on the sled, but that "has no effect"
Gravitational force: This force pulls the sled down, against the floor.
Normal force: This force "opposes" to the gravitational one, so they cancel each other.
These two forces cancel each other, so they have no direct impact on the movement of the sled. BUT, the friction force depends on the weight of the moving object, and the weight of the moving object depends on the gravitational force, so we need gravitational force in order to have friction force.
Then we can conclude that the forces acting on the sled are:
Gravitational
Tension
Normal
Friction.
His position x = V* t = 6.7*56= 375.2 m from point a
When ball is about to hit the ground, almost all its potential energy has already converted into kinetic energy. Thus at t=0.9 sec, it has least potential energy.