1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
erik [133]
3 years ago
8

**PLZ HELP IM TERRIBLE AT MATH**

Mathematics
1 answer:
Lena [83]3 years ago
5 0

Answer:

120.9

Step-by-step explanation:

I dunno if this is right or wrong but this is what a calculated somehow please tell me if this is wrong or not

You might be interested in
If Lin runs for 24 minutes at the same rate, how many laps does she run?
julia-pushkina [17]
About 21 hope I helped
7 0
3 years ago
The mean of a standard normal probability distribution _____. a. can be any value b. can be any value as long as it is positive
julsineya [31]

Answer:

D

Step-by-step explanation:

The mean of a standard normal distribution is always = 0 with the standard deviation being equal to. Therefore a standard normal distribution is a normal distribution described with a mean of 0 and standard deviation of 1. Since a standard normal distribution is centered at the middle with equal distribution to both the left and right of the distribution. The centre point is 0, which is the mean and the standard deviation is 1 to either side of the distribution.

5 0
3 years ago
Find the missing value for each rectangular prism. Volume: 8 2/3 Length:? Width: 4 1/3 Height: 2/3
Rainbow [258]

Answer:

3 2/3 = length

7 0
3 years ago
The dot plot shows the mass of apples in grams n the cafeteria. Each dot represents a different apple.
katen-ka-za [31]

Answer:

8 apples

Step-by-step explanation:

There are 3 apples with a mass of 39 grams, 2 apples with a mass of 40 grams, 1 apple with a mass of 41 grams, and 1 apple with a mass of 43, and lastly one apple with a mas of 44 grams.

5 0
3 years ago
A building company used 24 workers to prepare a building site. The site measured 30 acres and the work was completed in 10 days.
Svetradugi [14.3K]
If there is 30 acres and it was completed in 10 days they completed 3 acres per day. meaning each worker completed 3/24 or 1/8 acres per day. therefore if they have 45 acres and 12 days they need to complete 3.75 acres per day. if each worker completes 1/8 per day then it will take 30 workers to complete the whole site. as it asks for how many extra workers the answer would be 6.
4 0
4 years ago
Other questions:
  • A kids skipping rope is 7ft long. How many ropes could I cut from a 10 yard long piece of rope?
    10·1 answer
  • Triangle G H F is shown. Angle F G H is a right angle. The length of G H is 28 and the length of hypotenuse F H is 40.
    5·2 answers
  • Slope intercept form from a graph
    10·1 answer
  • Calculate the perimeter of this sector. ​
    8·1 answer
  • at megs party there were 14 chocolate cupcakes for every 21 vanilla cupcakes what was the ratio of chocolate cupcakes to vanilla
    7·1 answer
  • Can someone help me please
    9·1 answer
  • Jason used 0.5 cups or kernels to make 16 cups of popcorn. How many cups of popcorn would he make if he used 0.75 cups of kernel
    9·1 answer
  • PLZZZZZZZZZ HELP THANK YOUUUUUUUU !!!!!
    7·1 answer
  • -2y - 3y + 8 = 8 -5y - 12 <br><br> solve this equation fast please
    15·2 answers
  • Can someone please help me?​
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!