Answer:
0.1151 = 11.51% probability of completing the project over 20 days.
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Expected completion time of the project = 22 days.
Variance of project completion time = 2.77
This means that 
What is the probability of completing the project over 20 days?
This is the p-value of Z when X = 20, so:



has a p-value of 0.1151.
0.1151 = 11.51% probability of completing the project over 20 days.
65 feet squared.
8 times 10 is eighty, then you need to subtract 3 time 5 (which is 15), and that makes it 65 feet squared.
Step-by-step explanation:
öklid kurali var uygularsak:
- <em>(</em><em>3</em><em> </em><em>kök</em><em> </em><em>5</em><em> </em><em>)</em><em> </em><em>^</em><em>(</em><em>2</em><em>)</em><em>=</em><em>X</em><em>.</em><em>(</em><em>X</em><em>+</em><em>4</em><em>)</em>
- <em>4</em><em>5</em><em>=</em><em> </em><em>X</em><em>(</em><em>X</em><em>+</em><em>4</em><em>)</em><em> </em>
- <em>burada</em><em>n</em><em> </em><em><u>X</u></em><em><u> </u></em><em><u>=</u></em><em><u> </u></em><em><u> </u></em><em><u>5</u></em><em><u> </u></em>
- <em><u>Ceva</u></em><em><u>p</u></em><em><u> </u></em><em><u>B</u></em><em><u> </u></em><em><u>seçeneği</u></em><em><u> </u></em>
- <em><u>BAŞARILAR</u></em><em><u>.</u></em><em><u>.</u></em><em><u>.</u></em>