Answer:
40 percent
Step-by-step explanation:
Hope this helps!❆
Solutions: x=1<span>. Hope its right :)</span>
<span>The relationship between sample size and sampling error is that t</span>he
smaller the sample size, the bigger the sample error percentage.
To solve this, i suggest coming up with an equation. Let “C” represent cost of production, and “x” represent number of shirts ordered.
C = 9.25x + 4.25
Since C is $87.50, plug that value in and find x.
87.5 = 9.25x + 4.25
83.25 = 9.25x
9 = x
Therefore, Diego ordered 9 shirts. I hope this helps.
Answer:
1/4
Step-by-step explanation:
To find slope, we use the formula rise over run (y2-y1 over x2-x1)
So first, our y's: 7-5=2
And our x's: 12-4=8
2/8 simplifies to 1/4