Answer:
The probability that a randomly selected component needs rework when it came from line A₁ is 0.3623.
Step-by-step explanation:
The three different assembly lines are: A₁, A₂ and A₃.
Denote <em>R</em> as the event that a component needs rework.
It is given that:

Compute the probability that a randomly selected component needs rework as follows:

Compute the probability that a randomly selected component needs rework when it came from line A₁ as follows:

Thus, the probability that a randomly selected component needs rework when it came from line A₁ is 0.3623.
Answer:
The total area is 132 ft squared
Step-by-step explanation:
I found the area of the triangle by doing bh/2 and got 60. I then found the read of the rectangle bu doing bh and got 72z I then added both areas and got 132 as the total area.
Answer:
Step-by-step explanation:
Amount of brine = 100 gal
amount of salt = 80 lb
rate of water running = 4 gal / min
Let A be the amount of salt in lb in the tank at any time t.
(a) dA/dt = rate of salt in - rate of salt out
Rate of salt in = 0
rate of salt out = A x 4 / 100 = A / 25 lb/min
So, dA/dt = 0 - A/25 = - A/25 lb/min



When t = 0, A = 80 lb
So,

(b) Now, A = 40 lb
So,


take log on both the sides

t = 17.3 minutes