Answer:
EBM = +-54.126
Step-by-step explanation:
In this question we have confidence interval to be 80%
The formula to solve this is in the attachment.
Bar X = 1460
Z-alpha/2 = 1.282
Sd = standard deviation = 198 employees
n = 22 departments
After we have inserted all values in to the formula we have:
1460 +-(1.282*198/√22)
= 1460+-(54.12604)
= (1405.87, 1514.126)
The error bounded mean EBM
= +-z-alpha/2 x (sd/√n)
= 1.282 x 198/√22
= 1.282 x 42.22
EBM = +-54.126
From the given question we come to know of certain number of facts and they are:
At 1:00 PM the water level of the pond was = 13 inches
At 1:30 PM the water level of the pond was = 18 inches
At 2:30 PM the water level of the pond was = 28 inches
From the above given facts we can easily find the amount of water changing every half an hour.
Amount of increase in water from 1:00PM to 1:30 PM = (18 - 13) inches
= 5 inches
Amount of increase in water level from 1:30PM to 2:30PM = (28 -18) inches
= 10 inches
From the above two deductions we can come to the conclusion the the constant rate of change in water level is 5 inches for every half an hour.
Answer:
squre root 32
Step-by-step explanation:
Answer:
it is D.4
Step-by-step explanation:
each place on the number line goes up by 4