<h2>Yes the swap method exchange parameter values if passed by reference or the value gets changed inside the function.</h2>
Explanation:
Since the program is not given, I will try to guide you about the mode of parameters.
The meaning of swap is interchanging the values. It can be done by using temporary variable or without using it (if the values are integers).
While passing the parameters, there are two ways, call by value/pass by value and call by reference/ pass by reference.
If call by value, then the value gets swapped only inside the function and will not reflected in the calling portion. Call by reference is other way round.
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.
FOR ANYONE THAT WANTS TO STUDY AND CHILL SCREENSHOT BEFORE KATLE DELEATES THIS
meeting id: 932-8097-2909
password: z99LtX
Explanation:
The same thing as if you do it once
Answer:
columns, rows
Explanation:
In Computer programming, a atabase schema refers to the logical design of the database while the database instance refers to a snapshot of the data found in a database at a given instant in time.
Basically, in database management, the term "schema" is used to denote a representation of data while the term "instance" is used to denote an instance of time.
A database schema is a structure which is typically used to represent the logical design of the database and as such represents how data are stored or organized and the relationships existing in a database management system. There are two (2) main categories of a database schema; physical database schema and logical database schema.
Also, a database instance is a snapshot of the data in the database at a given instant in time and as such represents an operational database by following the conditions, validation and constraints set for a database management system.
These data can be stored or organized in a database management system through the use of multiple-column record formats.
In a multiple-column record of a data file, columns represent different variables and rows represent different cases (respondents) such as experimental data, independent observations etc.