Answer:
24 days
Explanation:
48÷2=24, 24 is half of 48, 24 days is half of the amount of time as 48 days, so if it takes 48 days for the whole lake to be covered, it would take 24 days to cover half of it.
Do you have a list of possible answers? "the following"
Answer:
The promise that the bill of rights would be added - that was done to appease the people who felt like it gave too much power to a central government.
Explanation:
The perimeter is all sides added together. If the perimeter around the whole thing is 74m then u need to find 4 numbers that add up to 74. Your length is 16 and your width is 21. Hope this helped
Answer:
The method of processing bitumen was nearly universal: heat it until the gasses condense and it melts, then add tempering materials to tweak the recipe to the proper consistency. Adding minerals such as ochre makes bitumen thicker; grasses and other vegetable matter add stability; waxy/oily elements such as pine resin or beeswax make it more viscous. Processed bitumen was more expensive as a trade item than unprocessed, because of the cost of the fuel consumption.
Explanation: