1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
krok68 [10]
3 years ago
15

1+1=21+1=21+1=21+1=21+1=21+1=21+1=21+1=21+1=21+1=21+1=2 lol

Mathematics
2 answers:
Vilka [71]3 years ago
7 0

Answer:

1 + 1 equals 2.

Step-by-step explanation:

When you take one of something, and you add it to another 1 of something, then you get 2 of something.

Novay_Z [31]3 years ago
3 0
I think the answer is 21
You might be interested in
A n =−1+3(n−1) an=−1+3(n−1) what is the 55 term in the sequence
Sindrei [870]
ANSWER

a_{55}=161


EXPLANATION

The general term for the sequence is


a_n=-1+3(n-1)


To find the 55th term, we have to substitute
n = 55
in to the general term and simplify.



This implies that,

a_{55}=-1+3(55-1)



a_{55}=-1+3(54)




a_{55}=-1+162



a_{55}=161


Therefore the 55th term is 161.
8 0
3 years ago
1/5(150x-80y+50-50x-25y+20)
ExtremeBDS [4]
1/5 (150x - 80y + 50 - 50x - 25y + 20) = 20x - 21y + 14
what I did is combined the like terms and multiplied each term within the parenthesis by .2
5 0
3 years ago
Read 2 more answers
A new roller coaster at an amusement park requires individuals to be at least​ 4' 8" ​(56 ​inches) tall to ride. It is estimated
Maksim231197 [3]

Answer:

a) 34.46% of​ 10-year-old boys is tall enough to ride this​ coaster.

b) 78.81% of​ 10-year-old boys is tall enough to ride this​ coaster

c) 44.35% of​ 10-year-old boys is tall enough to ride the coaster in part b but not tall enough to ride the coaster in part​ a

Step-by-step explanation:

When the distribution is normal, we use the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.

In this question, we have that:

\mu = 54, \sigma = 5

a. What proportion of​ 10-year-old boys is tall enough to ride the​ coaster?

This is 1 subtracted by the pvalue of Z when X = 56.

So

Z = \frac{X - \mu}{\sigma}

Z = \frac{56 - 54}{5}

Z = 0.4

Z = 0.4 has a pvalue of 0.6554

1 - 0.6554 = 0.3446

34.46% of​ 10-year-old boys is tall enough to ride this​ coaster.

b. A smaller coaster has a height requirement of 50 inches to ride. What proportion of​ 10-year-old boys is tall enough to ride this​ coaster?

This is 1 subtracted by the pvalue of Z when X = 50.

Z = \frac{X - \mu}{\sigma}

Z = \frac{50 - 54}{5}

Z = -0.8

Z = -0.8 has a pvalue of 0.2119

1 - 0.2119 = 0.7881

78.81% of​ 10-year-old boys is tall enough to ride this​ coaster.

c. What proportion of​ 10-year-old boys is tall enough to ride the coaster in part b but not tall enough to ride the coaster in part​ a?

Between 50 and 56 inches, which is the pvalue of Z when X = 56 subtracted by the pvalue of Z when X = 50.

From a), when X = 56, Z has a pvalue of 0.6554

From b), when X = 50, Z has a pvalue of 0.2119

0.6554 - 0.2119 = 0.4435

44.35% of​ 10-year-old boys is tall enough to ride the coaster in part b but not tall enough to ride the coaster in part​ a

5 0
3 years ago
What is the quotient in simplest form?<br><br> 8 Over 3 divided by two-thirds
Darina [25.2K]

Answer:

4

Step-by-step explanation:

8/3 ÷ 2/3

8/3 * 3/2

4

7 0
3 years ago
Bryson buys a bag of 64 plastic miniature dinosaur s. Could he distribute them equally into six storage containers and not have
Burka [1]
No because 6 multiplied by 10 is 60 and 6 multiplied by 11 is 66
8 0
3 years ago
Other questions:
  • Rewrite each expression using each base only once.
    11·1 answer
  • Davis Construction is building a new housing development. They begin by mapping the development out on a coordinate grid. They p
    5·1 answer
  • What is 0.12 Times 100
    15·1 answer
  • I NEED HELP ON THIS AS SOON AS POSSIBLE<br><img src="https://tex.z-dn.net/?f=help" id="TexFormula1" title="help" alt="help" alig
    11·1 answer
  • Is 35 prime or a composite
    7·2 answers
  • Round 34.5085066857 to 4 decimal places.<br> Answer:<br> Submit Answer
    10·1 answer
  • I'll give brainliest
    7·1 answer
  • If you actually know the answer plz give an explanation to the answer so i know you aren't just answering for points, please pla
    13·1 answer
  • What would Y be equal to in the problem 0.5x + 0.6y = 5.4
    12·1 answer
  • У
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!