Answer:
200N
Explanation:
EVERY FORCE IS OPPOSED BY AN EQUAL FORCE, REGARDLESS OF THE WEIGHT OF THE OBJECTS APPLYING THE FORCE.
The standard unit is KW/hr, = 1,000W/hr.
(85 + 60) = 145W.
You need to find its fraction of 1,000W., so (145/1000) = 0.145 KWH.
(0.145 x 10p) = 1.45p. per hr.
The angle of the wedge is 30°.
Answer:
5.88 ft/s
Explanation:
a) The block will slide down due to it's weight.
initial velocity u= 0
final velocity, v
acceleration, a = g sin 30° = 32 ft/s²× sin 30° = 16 ft/s²
Sliding displacement, s = 3ft
Use third equation of motion:

substitute the values and solve for v

b) Use conservation of momentum:
Initial momentum of the system = 0
final momentum = (15) ( 9.8)+ (25)(v')
v' = 5.88 ft/s
Answer:
Both A and D
Explanation:
Vector magnintude contains both speed and direction and so do these answer choices of 15km and 30m/s
Solution:
We have,
Power [P] = 25000 Watt
Mass [m] = 6000 kg
Height [h] = 20 metres
Time [t] = ?
Now,
P = W/t = F x d/t = mxgx h/t
Or, 25000 = 6000 x 10 x 20/25000 [.......g = 10
m/s^2]
Or, t = 6000 x 10 x 20/25000
Or, t = 1200/25
Therefore, t = 48 second
Hence, the required time for the crane to lift the load is 48 seconds.