Answer:
Sam is correct
Step-by-step explanation:
The third side is the one with greatest length. To make a triangle the other two lengths have to be greater than the greatest one when combined.
Hope this Helps.
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
Answer:
The zeros of the given polynomial function are
2,2,
Step-by-step explanation:
Given polynomial is 
To find the zeros equate the given polynomial to zero
ie., P(x)=0

By using synthetic division we can solve the polynomial:
2_| 1 -4 -1 20 -20
0 2 -4 -10 20
_____________________
1 -2 -5 10 |_0
Therefore x-2=0
x=2 is a zero of P(x)
Now we can write the cubic equation as below:

Again using synthetic division
2_| 1 -2 -5 10
0 2 0 -10
______________
1 0 -5 |_0
Therefore x-2=0
x=2 is also a zero of P(x).
Now we have 


is a zero of P(x)
Therefore the zeros are 2,2,
402,073,180 = 4.02073180 x 10^8