Answer:
CI = 21 ± 0.365
Step-by-step explanation:
The confidence interval is:
CI = x ± SE * CV
where x is the sample mean, SE is the standard error, and CV is the critical value (either t score or z score).
Here, x = 21.
The standard error for a sample mean is:
SE = σ / √n
SE = 3.2 / √510
SE = 0.142
The critical value is looked up in a table or found with a calculator. But first, we must find the alpha level and the critical probability.
α = 1 - 0.99 = 0.01
p* = 1 - (α/2) = 1 - (0.01/2) = 0.995
Using a calculator or a z-score table:
P(x<z) = 0.995
z = 2.576
Therefore:
CI = 21 ± 0.142 × 2.576
CI = 21 ± 0.365
Round as needed.
I think the largest time interval over which the actual price per watt of a solar panel was an increasing function of time is : 2004 to 2006
As it gives data %growth over previous year
from 2003 to 2004 it was -5.7% but from 2004 to 2005 6.7 % from 2005 to 2006 it is 97 % and from there it once again decline
hope this helps
9514 1404 393
Answer:
530.93 square units
Step-by-step explanation:
The area of a circle in terms of diameter can be found by ...
A = (π/4)d²
A = 3.14159/4×26² ≈ 530.929
Rounded to hundredths, the area of the circle is 530.93 square units.