49 = -7 (t + 1)
49 = -7t + 7
-7 -7
42 = -7t
÷ -7 ÷ -7
-6 = t
t = -7
The expected completion time is μ = 40 weeks.
The random variable, X = 38 weeks (the probable time)
If the standard deviation is σ, then the z-score is z = (x - μ)/σ.
Let us test the given standard deviations.
When σ=1,
z = (38-40)/1 = -2
From standard tables,
P(x<=38) = P(z<=-2) = 0.0228 =2.3%
When σ=2,
z = (38*40)/2 = -1
P(x<=38) = P(z<=-1) = 0.1587 = 15.9%
When σ=4,
z = (38-40)/4 = -0.5
P(x<=38) = P(z<=-0.5) = 0.3085 = 30.9%
Answers:
z=1 => 2.3%
z=2 => 16% (approx)
z=4 => 31% (approx)
I’m pretty sure it’s A sorry if I’m wrong
Answer:
C. 
Step-by-step explanation:
Cos A = Adj/Hyp
Reference angle = <A
Adjacent side = 8 ft
Hypotenuse = √(8² + 5²) = √89 (pythagorean theorem)
Thus:

Rationalize

