Answer:
Following are the solution to this question:
Explanation:
There is some difference between both the path expected by different computer simulations on 25 August. There is also some variance between 50 km to 500 km in the predicted route but the path is also unique in each model evaluation. It might be because any and every possible situation is repeated by the computer program. Many simulations will focus mostly on variations of strain, one might focus on the temperature variation, or one might concentrate on certain variables. But each model suggests all and every parameter which is inserted during a very photographer's encoding. There are therefore several possibilities of variability in forecasting the Hurricane's course. Here and some forecasts have shown that hurricanes would pass through Florida fully, and also some models have shown that hurricanes would pass thru the Gulf Coast, accompanied by the areas of Mississippi or Louisiana. This is the real difference in the direction of these models.
Answer:
- def ending_time(hour, minutes, seconds, work_time):
- if((seconds + work_time) // 60 > 0):
- minutes = minutes + (seconds + work_time) // 60
- seconds = (seconds + work_time) % 60
-
- if(minutes // 60 > 0):
- hour = hour + (minutes // 60)
- minutes = minutes % 60
- else:
- seconds = seconds + work_time
-
- return str(hour) + ":" + str(minutes) + ":" + str(seconds)
-
- print(ending_time(2,30,59, 12000))
Explanation:
The solution code is written in Python 3.
Firstly create a function ending_time that takes the four required input parameters.
Next, create an if statement to check if the numerator of (seconds + work_times) divided by 60 is over zero. If so, increment the minute and reassign the remainder of the seconds to the variable (Line 2-4).
Next, create another if statement again to check if the numerator of (current minutes) divided by 60 is over zero, if so increment the hour and reassign the remainder of the minutes to the variable (Line 6-8)
Otherwise, just simply add the work_time to the current seconds
At last return the time output string (Line 12).
Answer:
google can find u some discord servers
Explanation:
Answer:
You should disable termination on the Small Computer System Interface (SCSI) controller card.
Explanation:
SCSI is an acronym for Small Computer System Interface, which is also generally referred to as host bus adapter (HBA). The SCSI is typically a chip that controls the communication between the operating system (OS), storage devices such as hard disk drives and the host computer system. Also, it helps with the interpretation of the electrical signals between the Small Computer System Interface (SCSI) bus and the input-output bus for storage devices.
In this scenario, you want to upgrade a server by installing an external SCSI tape drive. The system currently has a Small Computer System Interface (SCSI) card and an internal SCSI hard drive. At bootup, the system fails to recognize the new tape drive. To solve this problem, you should disable termination on the SCSI controller card so that only the external SCSI tape drive will be active and the SCSI won't be detected.
<span>Dns (domain name system) servers translate all domain names into </span>ip addresses