Hello!
2.
To find the area of a kite we use the equation

p is the line in the kite that goes from top to bottom
q is the line in the kite that goes from left to right
put in the values

Multiply

Divide
55
The answer is 55
------------------------------------------------------------------------------------------------------
4.
I believe the answer is 770 yds squared
------------------------------------------------------------------------------------------------------
6.
The ratio is 12:7
------------------------------------------------------------------------------------------------------
8.
I do not know how to do 8 sorry
------------------------------------------------------------------------------------------------------
10.
I can't see the whole picture put I will do my best
Since the angle inside the circle is 50° the side is also 50°
------------------------------------------------------------------------------------------------------
12.
I do not know how to do 12 sorry
Hope this helps!
Uniform probability model is a measure of probability that evaluates which outcome is the best one to fall out. In this case, the probability model of uniformity is equal. Thank you for your question. Please don't hesitate to ask in Brainly your queries.
Answer:
50 is what it is estimated to
Step-by-step explanation:
Answer:
(x=days) g(x)=15x+200
Step-by-step explanation:
the 200 is a base fee, meaning you cant tag a variable on it and in this case it works as a y-intercept, the 15 dollars a day would be 15x because x is the number of days and to calculate how much it costs to work a few days you multiply the daily rate and the number of days, then add 200 to get your cost.
Answer:
1/2
Step-by-step explanation:
slope is

