You leave at 1 P.M., the wedding ceremony starts at 5 P.M.
This gives you a 4 hour gap, the Wedding is 350 miles away, and you're traveling at 65 miles an hour.
Simply you can use two methods, (65 * 4) to verify if you'd make it or not or (350/65) to ensure how many hours it would take in total.
65 * 4 = 260 | Since this is not 350, we can verify that you'd be late.
350/65 = 5.4 (estimated) | Meaning it'd take about 5.4 hours.
To know how long that is we'd have to convert over.
5.4 = 5 2/5ths, 60 minutes are in an hour. Divide 60 by 5 to get 12, meaning:
1/5ths = 12/60ths, with that said multiply that by 2 to get your answer.
2/5ths = 24/60ths or 24 minutes.
This means you'd take 5 hours and 24 minutes to get there.
Originally we stated that the process would take 4 hours. Subtract:
(5 hours and 24 minutes) - (4 hours) = (1 hour and 24 minutes)
Concluding that you'd be late by an hour and 24 minutes.
I hope this helps, have a great rest of your day! ^ ^
| | Ghostgate | |
The answer is 5x-11
You have to distrivute 1/3 into 6x and -9 and after you have your answer for those you can combine like terms.
multiply 12,800 x 15 = 192,000 then divide 192,000 by 100 = 1,920 so the answer is $ 1,920. Hope this helps!
Answer:
the width is ≤ 38 feet
Step-by-step explanation:
the perimeter of a rectangle is given by the relation : 2*( length + width)
P ≤ 120
2 (L + W) ≤ 120
L + W ≤ 60 ,,, L = 22
22 + W ≤ 60
W ≤ 38 feet
ANSWER
undefined
EXPLANATION
We want to find the slope of a line that is perpendicular to the line y = 1
The line y=1 is parallel to the x-axis.
In other words, the line y=1 is a horizontal line.
The line perpendicular to y=1 is a vertical line.
The slope of a vertical line is undefined